My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Eddco Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Eddco Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2010 9:21:11 AM
Creation date
5/21/2010 9:21:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Eddco Group, Inc.
PROJECT NAME
Distribution Pump Station Engineering Assistance for Phase 2 Expansion Q10910070027 Revision 4
RMP File Number
304
Date
5/19/2010
MO Ref
10-074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Redwood City Recycled Water Distribution Pump Station Expansion <br /> <br />October 7,2009 <br /> <br />Page 3 of 4 <br /> <br />The attached fee estimate (schedule A) of $66,090.00 is based upon our best estimate of the <br />hours required to successfully complete the project based upon the deliverables that have been or <br />will be delivered by the other design firms. <br />The project will be billed for actual hours accrued at the rates indicated on the attached fee scope. <br />Any hours and/or tasks not required for the execution will not be billed. <br /> <br />PROPOSED PROJECT (2) <br /> <br />'. Expansion of Distribution Pump Station to add 5 main pumps and associated <br />equipment, instrumentation, and programming as follows: <br />. Participate in evaluation of present design, installation, and operational data <br />. Modify and test existing PLC (Programmable Logic Controller) logic to facilitate <br />additions to facility and changes to operations to mitigate existing problems and <br />achieve project goals <br />. Modify and test existing Panel-View display unit to accommodate above <br />changes <br />. Modify existing SCADA system to accommodate above changes for a seamless <br />integration <br /> <br />ESTABLISH PROJECT MANAGEMENT METHODS (2) <br />. This project will be coordinated through Redwood City's Engineering and Construction <br />Division, Public Works Operations, Construction Management, and Kennedy Jenks . <br />Engineers. <br /> <br />REVIEW DESIGN DOCUMENTS (2) <br />. Kennedy Jenks En,gineers <br />. Current as-built documentation and programs <br />. Documentation assembled from first year of operations <br /> <br />PROGRAM DESIGN (2) <br /> <br />Design program changes to accommodate new equipment and operations while integrating <br />new equipment into existing control scheme. <br /> <br />PROGRAMMING (2) <br /> <br />Programming will be implemented and installed to minimize disruptions to current <br />operations <br /> <br />TESTING (2) <br /> <br />Includes testing of external hardware (VFDs, flow meters, pressure transducers) connected <br />to PLC. (Independent tests and witnessed tests) <br /> <br />Independent testing of control strategies and interlocks. Following independent tests, tests <br />will be repeated for witnessing by engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.