My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Flowserve US Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Flowserve US Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2010 1:35:41 PM
Creation date
6/18/2010 12:41:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Flowserve US Inc.
PROJECT NAME
Redwood City Recycled Water Project-Distribution Pump Station Capacity Increase-Main Pump Procurement Package
RMP File Number
304
Date
2/1/2010
Reso Ref
14982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VERTICAL TURBINE PUMPS <br /> <br />PART 1 - GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. Section Includes: Requirements to furnish and provide field support services for <br />vertical turbine pumping units, including motors, in accordance with the favorably <br />reviewed shop drawing submittals and as specified herein. <br /> <br />1.02 REFERENCES <br /> <br />A. Hydraulic Institute. <br /> <br />B. National Electrical Manufacturers Association (NEMA) Standard: <br />1. MG 1 Motors and Generators <br /> <br />C. Institute of Electrical and Electronics Engineers (IEEE) Standard: <br />1. 112 Test Procedure for Polyphase Induction Motors and Generators <br /> <br />D. Underwriters Laboratories (UL) Publication: Recognized Component Directory <br /> <br />1.03 SUBMITTALS <br /> <br />A. Refer to Final Favorably Reviewed Shop Drawing Package (Shop Drawing Review <br />Letter dated 15 January 2010, and responses to SDRL comments). <br /> <br />B. Witnessed or non-witnessed certified factory performance test results (see <br />Paragraph 1.04). <br /> <br />C. Installation Manual: Furnish complete assembly and installation manual for the <br />pumping equipment, including motors, by mail or email to the City at least two (2) <br />weeks prior to completion of pump manufacture. <br /> <br />D. Operation and Maintenance Manuals: Furnish for the pumping units, including <br />motors, in accordance with Section OPERATION AND MAINTENANCE DATA AND <br />SPARE PARTS. <br /> <br />E. Spare parts and special tools: Furnish the specified spare parts herein, and all <br />required special tools and accessories to perform maintenance on the pumping <br />equipment and motors. Refer to attached Sections GENERAL EQUIPMENT AND <br />MECHANICAL REQUIREMENTS, and OPERATION AND MAINTENANCE DATA <br />AND SPARE PARTS. <br /> <br />F. Certifications: <br />1. Signed certifications stating that each of the five existing suction barrels have <br />been properly leveled and meet the Pump Manufacturer's tolerances, <br />standards, and requirements for full time operation of the pumps (see <br />Paragraph 2.03). <br /> <br />Main Pump Procurement Package <br />0988015.00 <br />@ Kennedy/Jenks Consultants 2009 <br /> <br />Page 1 of 6 <br /> <br />Vertical Turbine Pumps <br />
The URL can be used to link to this page
Your browser does not support the video tag.