Laserfiche WebLink
<br />Bill of Materials, page 3 of 4 <br /> <br />F. Pressure Gauges per section 2.04.A and T cocks, or accessories <br /> <br />G. Sub-base plates, sole plates, anchor bolts, or templates <br /> <br />H. VFDs or any type of Controls, Instrumentation, MCCs, Starters, Power Factor Correction <br />Capacitors, Panels, cable, wiring, conduits, temperature or vibration probes, transducers, remote <br />controls, or monitoring systems <br /> <br />1. Standard tools or tool chests, lubricants, grease fitting extensions or guns <br /> <br />J. Field painting, touch-up paint supplies <br /> <br />IV. Price, FOB job-site, freight allowed to site... 360,846.17$. <br /> <br />The above price is broken down as follows: <br /> <br />Qty (5) Pumps and Motors 319,310$ <br /> <br />Taxes at 9.25% for (5) pumps / motors 29,536.17$ <br /> <br />Freight for the 5 units 5,000$ <br /> <br />Start up services for the 5 units 7,000$ <br /> <br />The above pricing does not include the cost of submittals which were handled in an order ' <br />direct with Redwood City. <br />