Laserfiche WebLink
<br /> TABLE 1 <br /> COST PROPOSAL <br /> Chemcial Way Properties RFQ/RFP <br /> Redwood City, California <br />TASK DESCRIPTION QUANTITY UNIT UNIT TOTAL <br /> COST COST <br />1.0 REVIEW OF REASONABLY ASCERTAINABLE RECORDS <br /> Principal Engineer 2 Hour $215 $430 <br /> Senior Geologist 12 Hour $165 $1,980 <br /> Project Geologist 16 Hour $95 $1,520 <br /> Radius Database Search Fee 1 Each $1,750 $1,750 <br /> Expenses 1 Lump sum $350 $350 <br /> Subtotal (rounded) $6,000 <br />2.0 CONDUCT A SITE RECONNAISSANCE <br /> Senior Geologist 8 Hour $165 $1,320 <br /> Expenses 1 Lump sum $150 $150 <br /> Subtotal (rounded) $1,500 <br />3.0 INTERVIEWS <br /> Senior Geologist 2 Hour $165 $330 <br /> Project Geologist 6 Hour $95 $570 <br /> Senior Staff 1 Hour $95 $95 <br /> Subtotal (rounded) $1,000 <br />4.0 PREPARE A DRAFT PHASE I ESA REPORT <br /> Principal Engineer 6 Hour $215 $1,290 <br /> Senior Geologist 16 Hour $165 $2,640 <br /> Senior Staff 24 Hour $95 $2,280 <br /> Drafter 32 Hour $95 $3,040 <br /> Expenses 1 Lump sum $500 $500 <br /> Subtotal (rounded) $9,800 <br />5.0 ATTEND AND PARTICPATE IN PROJECT MEETINGS <br /> Principal Engineer 6 Hour $215 $1,290 <br /> Expenses 1 Lump sum $100 $100 <br /> Subtotal (rounded) $1,400 <br /> ESTIMATED TOTAL COST (Rounded) $19.700 <br /> <br />Page 1 of 1 <br />