My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Waterworks Industries
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Waterworks Industries
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:55:47 PM
Creation date
5/15/2003 1:55:19 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Waterworks Industries
PROJECT NAME
Redwood Shores lagoon mgt plan
RMP File Number
304
Date
9/10/1999
MO Ref
02-142
Task Order
Yes
Box
5935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B-1 <br /> SCHEDULE OF FEES - 2002 <br /> <br />PERSONNEL <br />Supervisory Engineer .............................................................................. 105.00-135.00/hr <br />Senior Engineer ........................................................................................... 95.00-120.00/hr <br />Supervisory Biologist .............................................................................. 85.00-110.00/hr <br />Senior Fisheries Biologist .............................................................................. 80.00-105.00/hr <br />Staff Engineer or Biologist .............................................................................. 65.00-75.00/hr <br />Supervisory Pest Control Operator .................................................................... 55.00-70.00/hr <br />Staff Pest Control Operator .............................................................................. 35.00-45.00/hr <br />Senior Technician ........................................................................................... 50.00-60.00/hr <br />Staff Technician ........................................................................................... 30.00-45.00/hr <br />Technical or Office Assistant .................................................................... 25.00-35.00/hr <br />Draftsman or CAD Draftsman (equipment included) ....................................... 60.00-80.00/hr <br />Principal - Special Consultation .................................................................... 150.00/hr <br /> <br />PROFESSIONAL SERVICES <br />Lagoon Surveys ........................................................................................... 85.00/hr <br />(Includes Boat with motor, Senior Technician or pest Control Operator) <br />Travel time and launch fee .............................................................................. 30.00/hr <br />Harvester ...........................................................................................150.00/hr <br />(Includes one Senior Technician, one Staff Technician, conveyor trailer, <br />vehicle to tow trailer and fuel <br /> <br />Transport Fee ........................................................................................... 200.00/hr <br />(Charged for the first day of a harvesting cycle) <br />Launch Fee <br />Concrete ramp provided .............................................................................. No Charge <br />Tilt Trailer used to launch and retriev .................................................................... 250.00 <br />Crane used to launch and reb .............................................................................. Cost + 15% <br />Vegetation Disposal <br />Within one mile, each way, of the launch si ............................................................ INC <br />Any distance over one mile each way ............................................................ 2.50/mile <br />If needed to be loaded in dumpsters, per man ................................................ 25.00/hr <br />Chemical Application of Algaecide EarthTec ................................................ 55.00/9al <br />(includes chemicals, boat with motor, spray equipment, Chemical <br />Applicator and Staff Technician) <br />Chemical Application of Herbicide REWARD ................................................ 175.00/gal <br />(Includes chemicals, boat with motor, spray equipment, Chemical <br />Applicator and Staff Technician) <br />MISCELLANEOUS <br />Requested Overtime: 125% of Regular Rates <br />Outside Services / Rentals / Permits / Job Materials: Cost + 15% <br />Expert Testimony and Courtroom, Deposition or Hearing Attendance: 150% of Regular Rates <br /> <br /> Waterworks Industries, Inc, <br /> January 1,2002 - February 28, 2003 7 AGMT-272.Task Order No. 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.