Laserfiche WebLink
<br />January 16, 2003 <br /> <br />EXHIBIT B <br /> <br />The total estimated level of effort for this work is estimated at $544,154.00 as detailed in this <br />proposal. This total ís to be partially offset with a credit of $7,850 for the preparation of a Storm <br />Water Pollution Prevention Report as well as $4,246 for preparation of Storm Water Pollution <br />Prevention Plans because these items are no longer required to be submitted to the Regional <br />Water Quality Control Board prior to construction. The Contractor is now solely required to <br />prepare and submit plans to RWQCB for approval. Also, a credit of $41,855 has been given for <br />the design of the pump station as this facility is no longer required based on the current roadway <br />design. Therefore, the total amount is as follows: <br /> <br />TOTAL <br /> <br />544,154 <br />(7,850) <br />(4,246) <br />(41.855) <br />$490,203 <br /> <br />Extra Work Request <br />Storm Water Pollution Prevention Plan Report (credit) <br />Storm Water Pollution Prevention Plans (credit) <br />Pump Station Design (credit) <br /> <br />The following worksheets provide a detailed breakdown for the work to be performed by Mark <br />Thomas & Company, Inc. and its subconsultants. <br />