Laserfiche WebLink
<br />ESTIMATED LEVEL OF STAFFING FOR ROUTE 101/ RALSTON IC . EWR <br /> <br /> <br />Task 1 . Managem.n~ Reports, etc. alk 1. Manegemen~ Reports, etc. <br />1.1 Altemative ArnIlysis 48 24 12 30 114 1.IAltemaliveAnaJysis 7.440 2.770 1.192 2.094 40 13.535 13.535 <br />1.2 Project Management & Meetings 24 12 36 1.2 Project Management & Meetings 3.720 1,514 5,234 5.234 <br />1.3 Revise Project Report 72 8 12 12 104 1.3ReviseProjectReport 11.160 1,009 1.385 837 2.501) 16.892 16.892 <br />1.4 Revise GAD 30 24 80 40 174 1.4ReviseGAO 4.650 3.028 9.233 2.791 125 19.827 19.827 <br />1.5SupplementaIFactshee1 12 16 4 32 1.5 Supplemental Fact sheel 1.860 2.018 279 150 4.308 4.308 <br />1.6 Revise Orainage Report 4 4 150 158 1.6 Revise Drainage Report 620 505 17,312 300 18.736 18.736 <br />1.7 Storm Water Data Report 40 80 64 16 200 1.7 Storm WalerData Report 6.200 10.092 7.386 1.117 24.795 24.795 <br />1.8 Island Pkwy Type Selection Report 16 12 36 12 76 1.8 Island Pkwy Type SeIedioo Report 2.480 1.514 4.155 837 100 9.086 9.086 <br />1.9TunneiConCO Jt 4 10 4 18 1.9TunnelConÅ“pt 620 1.261 462 2.343 2.343 <br />Subtotal Task 1 250 166 370 12 114 912 Subtotal Talk 1 31.310 20.941 39.933 5.862 3.175 114.755 114.755 <br />Task 2. SuNey' RIW Engineering alk 2. SuNey. R1N Englneertng <br />2.1 Right 01 Way Engineering .1 Right of Way Engìneering <br />a) Revise Hardcopy Maps 56 44 80 64 16 260 a) Revise Hardcopy Maps 8.680 5.551 7.945 4.466 2.960 100 ~.7°ill ~.701 <br />II) Revise Appraisal Maps 32 12 72 34 150 b) Revise Appraisal Maps 4.960 1,514 7.150 2.373 100 16.097 16.097 <br />c) Stake Right 01 WaylWelland Impacts 2 4 10 4 20 40 c) Stake Right ofWayNielland Impacts 310 505 1.154 397 3.700 6.086 6.066 <br />Subtotal Task 2 90 60 10 156 98 36 450 SubtotalTllk 2 13.950 7.569 1.154 15.492 6.839 6.660 200 51.864~~ 51.864 <br />Task 3. Revise 65% Design Ilk 3. Revise 65% Design <br />a) Typical Sections 4 12 16 8 16 56 a) Typicai Sections 620 1.514 1.847 794 1.117 5.891 5.891 <br />II) layout 6 40 48 40 24 158 b layout 930 5.046 5.540 3.972 1.675 4.501) 21.663 21.663 <br />c) Profile 6 16 40 8 16 86 c) Profile 930 2.018 4,616 794 1.117 9.476 9.476 <br />d) Constructioo Delais 4 12 72 16 24 128 d) Construction Details 620 1,514 8,310 1,589 1.675 13.707 13,707 <br />e) Orainge Plan & Profile 2 16 80 40 48 186 e) Drainge Plan & Profile 310 2.018 9,233 3.972 3.350 18.883 18.883 <br />fi Pavemenl Deinealion 2 8 16 4 24 54 fi Pa,emenlDelineation 310 1.009 1.847 397 1,675 5.238 5.238 <br />9) Signing 2 4 8 8 48 70 g) Signing 310 505 923 794 3.350 5.882 5.882 <br />II) StagingITrafficHandUng 8 24 48 20 72 172 h) Slaglng/TrafficHandling 1.240 3.028 5.540 1.986 5.024 16.818 16,818 <br />i) Retaining Waiis 4 16 24 122 64 230 i) Retaining Walis 620 2.018 2.770 12.116 4.466 21.990 21.990 <br />iI Sanitary Sew.. Relocation 12 24 36 j) SanìlaJy Sewer Relocation 1.385 1.675 17,189 20,249 20.249 <br />kl Construclion Details (AOL Material 2 8 32 8 50 k) Construction Detaiis (AOL Material) 310 1.009 3,693 558 5.571 5,571 <br />I) ConstruclionDetais(WickDrains 2 8 12 16 38 I) Consbudion Details (Wick Orains) 310 1,009 1,385 1.117 3.821 3.821 <br />m) island Pkwy 8ridge Plan & Detaiis 40 100 80 220 m) Island Pkwy Bridge Plan & Detaiis 6,200 12.615 7.945 26.759 2ti.759 <br />n) Box Culvert Parapet Wal 2 24 8 34 n) Box Culvert Parapel Wan 310 3.028 558 3.896 3.&96 <br />0) Box Culvert Bridge Plan & Details 24 40 54 16 134 0) Box Culvert Bridge Plan & Detaiis 3.720 5.046 6.232 1.117 16,115 16.11; <br />p) Quantities & Eslinate 2 24 24 24 72 146 p) Quantities & Estimate 310 3.028 2.770 2.383 5.024 13.515 13,515 <br />Subtotal Task 3 110 352 486 370 480 1.798 ubtotaiTask3 17.050 44.404 56.090 36.744 33.496 21,889 209.474 209.474 <br />!TOTAL FOR PROJECT II 450 578 866 538 692 36 I~~OTAL FOR PROJECT I 62,310 72,914 97.177 52.236 46.197 25.~ 376.09 376.093 <br /> <br />Page 1 of 1 <br />