Laserfiche WebLink
MQNITORING VERIFICATION <br /> IDENTIFIED IMPACT REIATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verificacion Entit Re uirements <br /> Impact 9-9: impacts on Transit Mitigation 9-9: The City shall City; (air-share Ci[y During project- <br /> Service. Based on the trip generation coordinaie with Samtrans. Caltrain, reimbursement specific <br /> estimates, buildout of the DPP would and the High Speed Raif Authority to from future environmental <br /> generate an estimated additional 106 facilitate expanded transit services to individual project review and <br /> AM peak hour transit trips and 147 PM 4he DPP area in pace with DPP- applicants. ongoing <br /> peak hour transit trips, which would related increases in transit demand. throughout DPP <br /> place additional demand on existing However, given the long-term buildout implementation <br /> Caltrain, Samtrans, and shuttle service, of the DPP and the uncertainty of the <br /> as well as the streetcar proposed in the existing and proposed transit facilities, <br /> New General Plan and the proposed equipment and services in ihe future, <br /> future High Speed Rail service. it cannot be determined at this time <br /> Therefore, the transit impacts of fhe whefher service enhancements would <br /> DPP would be a potentially significani be implemented concurrently with <br /> impact. increased demand such that <br /> acceptable service levels would be <br /> maintained. Therefore, the impacts of <br /> the DPP on transit service are <br /> currently deemed to be significant <br /> and unavoidable. <br /> Impact 9-10: Cumulative Impact on Mitigation 9-10. Mitigation 9-1 City; fair-share City; Caltrans; If and when <br /> EI Camino ReaUWhipple Avenue identified under Project Conditions reimbursement C/CAG improvements <br /> Intersection. Under Cumulative With (eastbound left turn lane and convert from future adopted, City shall <br /> Project Conditions during the PM peak eastbound shared left-through lane individual project implement <br /> hour, this intersection would continue to into an exclusive through lane on applicants. improvements and <br /> operate at an unacceptable LOS F. The Whipple Avenue, change split phase fair-share <br /> additional project traffic would cause the to protected phase) would also requirement. <br /> average delay to increase by more than improve the intersection operation Individual projects <br /> five (5) seconds. This change would under Cumulative With Project may require <br /> represent a significant cumulative Conditions, still, however, resulting in Transportation <br /> impact. LOS F operation (131.0 sec/veh). Any Demand <br /> improvements within the EI Camino Management <br /> Real right-of-way would require (TDM) plans per <br /> Caltrans approval. As noted under City General Plan <br /> Project Conditions, due to roadway policies and <br /> width constraints and the need to C/CAG adopted <br /> acquire additional right-of-way from guidelines. <br /> fronting commercial properties, these <br /> improvements may be deemed � <br /> infeasible, and this impact would be � <br /> considered significant and � <br /> unavoidable. If the City considers � <br /> these improvements feasible, City <br /> staff shall seek Calirans' approval to <br /> im lement these im rovements. If <br /> � <br /> C7 <br /> Page 17 C:IDocuments and SettrngsttpassanisrlLocal SettrngslTemporary lntemet Files10LK491mmcht (f0671).doc <br />