Laserfiche WebLink
MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verification Enti Re uirements <br /> Road that wiff house. <br /> accommodate or serve sensifive <br /> receptors to rncorporate <br /> appropriate design and <br /> construction features (e.g„ filters <br /> on HVAC systems) thaf reduce <br /> potential exposure of persons to <br /> pollutanfs. (New Generai Plan <br /> Policy PS-2.6) <br /> ■ Sensitive Receptor Protection. <br /> lncrease protection of sensitive <br /> receptors (facilities where <br /> individuals are highly susceptible <br /> to the adverse effects of air <br /> pollutants, such as housing, child <br /> care centers, retirement homes, <br /> schoo/s, and hospitals) near high- <br /> volume roadways, dry c/eaners <br /> using perchlorethylene, large gas <br /> stations, the Porf of Redwood <br /> City, and rail yards. Amend the <br /> Zoning Ordinance and other <br /> regulations to require mitigation <br /> measures such as increased <br /> indoor air filtration to increase fhe <br /> protecfion of sensitive receptors <br /> near major emission sources. <br /> (New General Plan P�ogram PS- <br /> 7) <br /> • 5ensitive Receptor Siting <br /> Requrrements. Require projects <br /> proposed within 500 feet of high- <br /> volume roadways and that house <br /> or accommodate sensifive <br /> receptors to include an analysis <br /> of the potential health risks. <br /> Mitigation measures fhat comply <br /> with adopted standards of the <br /> BAAQMD for control of <br /> odor/foxics for sensitive receptors <br /> shaf! be identified in order to <br /> reduce tl�ese risks to acceptable <br /> � <br /> C7 <br /> Page 36 C:1Documents and SetlingsltpassanisALocal SettingslTemporary Intemet Files10LK491mmcht (10671�.doc <br />