My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.0 <br /> Exhi�� 94 � <br /> Impact 9-16: Cumulative Impact on Broadway/Walnut Street Intersection. <br /> Under Cumulative With Project Conditions during the PM peak hour, this <br /> intersection would continue to operate at an unacceptable LOS F. The additional <br /> project traffic would cause the critical delay to increase by more than five (5) <br /> seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Mea.sures. This impact could be mitigated to a less <br /> than significant level with the adoption of Mitigation Measure 9- I 6(page 9-71 of <br /> the DEIR), which would require signalization of the intersection. However, the <br /> City's New General Plan adopted on October 11, 2010 includes PED policies <br /> intended to promote alternative modes of transportation in the DPP area, <br /> emphasizing pedestrian and bicycle travel and a reduction in the number of <br /> vehicle miles traveled within and by residents of the City. Mitigation Measure 9- <br /> 16 would conflict with these policies by impeding pedestrian mobility. In <br /> addition, as explained above, this potentially significant cumulative impact could <br /> be considered less than significant under the City's new LOS policies. Assuming, <br /> however, that this identified traffic increase represents a potentially significant <br /> cumulative impact, because implementing Mitigation Measure 9-16 would <br /> conflict with the City's PED policies, this measure is deemed infeasible and this <br /> potentially significant cumulative impact is deemed to be significant and <br /> unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP ovenide the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forih <br /> in the Statement of Overriding Considerations below. <br /> Impact 9-17: Cumulative Impact on Broadway/Chestnut Street Intersection. <br /> Under Cumulative With Project Conditions during the PM peak hour, this <br /> intersection would continue to operate at unacceptable LOS F. The additional <br /> project traffic would .cause the critical delay to increase by more than five (_5) <br /> seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-5� to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the Cit_y, the <br /> City Council finds that: <br /> S:UtESOLUTIONSUteso. 2092 CFQA Findings for DPP Exhibit B.doc 34 <br /> 012011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.