My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.0 <br /> ExhiB�$ 95 � <br /> (i) Mitigation Measures. As described in Mitigation 9-17 (page 9-72 <br /> of the DEIR) this impact cannot be mitigated because the configuration of the <br /> intersection and the approaches to the intersectioil combined with the location of <br /> the existing railroad tracks make any proposed reconfiguration or improvements <br /> ineffective in reducing traffic delays and therefore infeasible. Therefore, this <br /> impact is deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation ' <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> ' (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the si�nificant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9-18. Cumulative Impact on Broadway/Woodside Road Intersection. <br /> Under Cumulative With Project Conditions during both peak periods, the <br /> intersection would continue to operate at unacceptable LOS F. The additional <br /> project traffic would cause the critical delay to increase by more than five (5) <br /> seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9-5 (page 9-51 of the DEIR) as discussed in <br /> Impact 9-5 above. However, as discussed above, the changes required by <br /> Mitigation Measure 9-5 are within the responsibility and jurisdiction of Caltrans, <br /> and can and should be adopted by Caltrans. Because implementation Mitigation <br /> Measure 9-5 is outside of the City's jurisdiction, it is deemed infeasible and <br /> therefore this impact is deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> S:\RESOLUTIONS1Reso 2U92 CEQA Findings for DPP Eshibit B.doc 3� <br /> 012011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.