My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.0 <br /> Exhi�� 96 <br /> Impact 9-19. Cumulative Impact on Bay Road/Woodside Road Intersection. <br /> Under Cumulative V4'ith Project Conditions during both the AM and PM peak <br /> hour, this intersection would continue to operate at unacceptable LOS F. The <br /> additional project traffic would cause the critical delay to increase by more than five <br /> (5) seconds for the PM peak hour. I <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9-19 (page 9-73 of the DEIR) which would <br /> require reconfiguration of the northbound approach so as to reduce the critical <br /> delay to less than 5 seconds. However, the improvements required by Mitigation <br /> I Measure 9-19 are within the responsibility and jurisdiction of Caltrans, and can <br /> and should be adopted by Caltrans. Because implementation of this mitigation <br /> measure is outside of the City's jurisdiction, it is deemed infeasible and therefore <br /> this impact is deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The enviromnental, social, <br /> economic and �ther benefits of the DPP override the significant adverse impacts <br /> of the DPP rela�ing to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9-20. Cumulative Impact on Bradford Street/Main Street <br /> Intersection. Under Cumulative With Project Conditions during both the AM and <br /> PM peak hour, the intersection would continue to operate at unacceptable LOS F. <br /> The additional project traffic wouId cause the critical delay to increase by more <br /> than five (5) seconds. <br /> a) Potential Impact. Thc impact identified above is described and discussed <br /> on pages 9-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9-20 (page 9-74 of the DEIR) which would <br /> require signalization of the intersection. However, the City adopted PED policies <br /> in the City's New General Plan that are intended to promote alternative modes of <br /> transportation in the DPP area, emphasizing pedestrian and bicycle travel and a <br /> reduction in the number of vehicle miles traveled within and by residents of the <br /> S:UZESOLUTiUNSIReso. 2092 CEQA Findings for DPP F,xhibit B.doc 36 <br /> 012011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.