Laserfiche WebLink
<br />SFE <br /> <br />7. Prepare Landscape Architectural (LA) General Notes, Legend and <br />Abbreviations Sheet: Prepare a 60% complete LA General Notes, Legend and <br />Abbreviations sheet that establishes the key landscape architectural drawing notes, <br />graphic symbols and construction detail references. <br /> <br />8. Prepare Plaza and Hardscape Layout and Reference Plans: Prepare the 60% <br />complete Layout and Reference Plans that locates the key plaza and hardscape features of <br />the project, and references the associated LA plan enlargements and construction details. <br /> <br />9. Prepare Planting Plans: Prepare the 60% complete Planting Plans that locate and <br />identify the primary and secondary plant materials, based on the plant palette previously <br />developed by FTB, SFE, the arborist and the City. <br /> <br />10. Prepare Irrigation Plans: Prepare the 60% complete Irrigation Plans. These plans <br />will identify the primary irrigation equipment, and establish the irrigation layout based on <br />the on the 60% complete Planting Plans. <br /> <br />11. Prepare Plaza and Hardscape Construction Detail Sheets: Based on FTB's <br />schematic design details, prepare 60% complete plaza and hardscape construction detail <br />sheets. <br /> <br />12. Prepare Planting Detail Sheets: Based on the Planting Plans, prepare 60% <br />complete planting detail sheets based on the standard details of the City of Redwood City <br />and the best practices for unique planting conditions. <br /> <br />13. Prepare Irrigation Detail Sheets: Based on the Irrigation Plans, prepare 60% <br />complete irrigation detail sheets based on the standard details of the City of Redwood <br />City and the best practices for unique irrigation conditions. <br /> <br />14. Prepare LA Technical Specifications: Based on the standard specification format <br />of the City of Redwood City, prepare a 60% complete LA technical specification. <br /> <br />15. Post 60% Complete LA Construction Documents to Reprographic FTP Site: <br />Post the 60% complete LA Construction Documents to the repro graphic company FTP <br />site for copying and distribution to FTB and the project team. <br /> <br />16. Revise 60% CD's based on FTB Review: Based on the review ofFTB, revise the <br />60% complete LA construction documents. <br /> <br />17. Attend All Day 60% Review Meeting: Attend an all day 60% review meeting at <br />FTB to identify key areas of work prior to the city submittal, and further the coordination <br />between the project team members. <br /> <br /> <br /> <br /> <br />