My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 10:49:59 AM
Creation date
8/12/2003 9:35:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design of courthouse square
RMP File Number
405
Date
4/28/2003
MO Ref
RD-03-12 RD-05-04 RD 06-223
Amendment
Yes
Box
6589 & 6600 (?)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SFE <br /> <br />5. Prepare Working Session Memorandum/Action List & Distribute: Following the <br />Working Session, prepare a memorandum that summarizes the key meeting decisions and <br />issues, and identifies the key action items for each team member. <br /> <br />6. Revise LA General Notes, Legend and Abbreviations Sheet: Prepare a 95% <br />complete LA General Notes, Legend and Abbreviations sheet that establishes the key <br />landscape architectural drawing notes, graphic symbols and construction detail <br />references, based on the 60% review comments. <br /> <br />7. Revise Plaza and Hardscape Layout and Reference Plans: Prepare 95% complete <br />Layout and Reference Plans that locates the key plaza and hardscape features of the <br />project, and references the associated LA plan enlargements and construction details, <br />based on the 60% review comments. <br /> <br />8. Revise Planting Plans: Prepare 95% complete Planting Plans that locate and <br />identify the primary and secondary plant materials, based on the plant palette previously <br />developed by FTB, SFE, the arborist and the City, based on the 60% review comments. <br /> <br />9. Revise Irrigation Plans: Prepare 95% complete Irrigation Plans that identify the <br />primary irrigation equipment, and establish the irrigation layout based on the on the 95% <br />complete Planting Plans, based on the 60% review comments. <br /> <br />10. Revise Plaza and Hardscape Construction Detail Sheets: Prepare 95% complete <br />plaza and hardscape construction detail sheets, based on the 60% review comments. <br /> <br />11. Revise Planting Detail Sheets: Based on the Planting Plans, prepare 95% complete <br />planting detail sheets based on the standard details of the City of Redwood City and the <br />best practices for unique planting conditions, and the 60% review comments. <br /> <br />12. Revise Irrigation Detail Sheets: Based on the Irrigation Plans, prepare 95% <br />complete irrigation detail sheets based on the standard details of the City of Redwood <br />City and the best practices for unique irrigation conditions, and the 60% review <br />comments. <br /> <br />13. Revise LA Technical Specifications: Prepare a 95% complete LA technical <br />specification, based on the 60% review comments. <br /> <br />14. Post 95% Complete LA Construction Documents to Reprographic FTP Site: <br />Post the 95% complete LA Construction Documents to the repro graphic company FTP <br />site for copying and distribution to FTB and the project team. <br /> <br />15. Revise 95% CD's based on FTB Review: Based on the review ofFTB, revise the <br />95% complete LA construction documents. <br /> <br /> <br /> <br />+ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.