My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-07-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2006 9:21:49 AM
Creation date
7/20/2006 1:07:25 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 7A <br /> Page 4 <br /> Survey of Other Cities <br /> In an effort to benchmark the proposed Policy against the practices of other communities <br /> Staff has conducted some additional research, at the request of City Council, regarding <br /> how other Cities on the peninsula (namely San Mateo and Foster City) address <br /> construction on waterfront residential properties. The following statements identify key <br /> components of their respective processes: <br /> San Mateo <br /> . The Department of Public Works administers the "Marina Lagoon Dock Permit" <br /> program under a regional permit issued by the U.S. Army Corps of Engineers. <br /> . Property owners are required to renew their Dock Permit on an annual basis (2005 <br /> fee is $93, based on the Consumer Price Index). <br /> . Insurance certificate is required naming City of San Mateo as additional insured. <br /> . City conducts periodic inspections for compliance and safety under Harbor Patrol <br /> services. <br /> . Allow fixed and floating docks subject to an approved "Boat Dock Plan", which <br /> includes a hold harmless indemnity clause. <br /> .. Requires a Building Permit from Building Department and an Encroachment Permit <br /> from Public Works Department. <br /> Foster City <br /> . Boat docks are required to go through a "Waterfront Property Development Permit" <br /> and an "Architectural Review Procedure". <br /> . Additional requirements are established in the City's Architectural and Solar <br /> Guidelines. <br /> . Projects reviewed by the Planning Commission and a few projects reviewed by staff <br /> are billed on a time and materials basis. <br /> . Building Permits are issued by the Building Department and are based on the <br /> valuation of the work. <br /> . Construction permits are issued by Public Works and the City "reserves the right to <br /> prohibit the use of equipment or procedures which may damage the existing lagoon <br /> slopes or impair construction of the wall." <br /> Redwood City's proposed Policy is consistent (although tailored to Redwood City's specific <br /> needs) with the standard practices of these Cities. <br /> Alternatives <br /> 1. Status Quo - Continue to operate under the current requirements of the <br /> Redwood City Zoning Ordinance4 <br /> Pros: -Requires no additional staff time. <br /> Cons: -The current Zoning Ordinance provides little to no direction on what <br /> type of construction is appropriate on the Lagoon Bank. <br /> -Exposes the City to increased liability should slope failure occur as a <br /> result of existing non-permitted improvements. <br /> 4 The Redwood City Zoning Ordinance requires a Planned Development Amendment (PDA) for <br /> modifications within the TP-W Zoning District; however, no direction is provided as to where and what <br /> level of improvements are appropriate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.