My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�. �-�-i <br /> � H. Proiect Pedestrian Accessibiliri Imaacts <br /> � <br /> " Potential Impact: If constructed without a sidewalk along its Bair Island <br /> Road frontage, the Project would contribute to and exacerbate the existing discontinuity <br /> of pedestrian facilities along Bair Isiand !'oad and East Bayshore Road (Impa: t 7-8). <br /> Mitigation: The Project shall construct a continuous pedestrian facilit�r, <br /> such as a sidewalk or a pedestrian path, along the entire length of the ProjecYs Bair <br /> Island Road frontage (Mitigation 7-8). <br /> Findings: This mitigation measure is feasible and would reduce the <br /> impact described above to a less-than-significant level. <br /> I. Bicvcle Accessibilitv Imaact <br /> Potential Impact: Construction of the Project could result in insufficient <br /> right-of-way width along Bair Island Road to accommodate bicycle facilities preliminarily <br /> planned for inclusion in the San Francisco Bay Trail extension (Impact 7-9). <br /> Mitigation: The Project shall dedicate adequate right-of-way along Bair <br /> Isiand Road to accommodate future bicycle facilities (Mitigation 7-9). <br /> Findings: This mitigation measure is feasible and would reduce the <br /> impact described above to a less-than-significant level. <br /> � J. Proiect Emeraencv Access Imaact <br /> Potential Impact: During an emergency evacuation of the Bair Island <br /> Road area with the Project at full occupancy, traffic volumes on Bair Island Road, East <br /> Bayshore Road, and Whipple Avenue could be expected to exceed roadway capacfties, <br /> as further described in Mitigation 7-'10. <br /> Mitigation: The extension of Blomquist Street over Redwood Creek to <br /> the East Bayshore Road/Bair Island Road intersection is currently planned by the City <br /> and partialiy funded. The project applicant shall pay a minimum of 20% of its fair share <br /> contribution to the costs of the improvement prior to any final subdivision map approval. <br /> The remainder of the applicanYs fair share contribution shall be paid prior to final <br /> subdivision approval for the map which includes the 500"' residential unit within the <br /> Project (Mitigation 7-10). <br /> Findings: The extension of Blomquist described in Mitigation 7-10 would <br /> reduce the impact described above to a less-than-significant level. <br /> K. Proiect-Related Secondarv Impact of the Blomauist Extension on the <br /> Blomauist StreeUMapie Street Intersection <br /> Potential Impact: Completion of the Blomquist Extension described in <br /> _ Mitigation 7-10 is expected to contribute to increased traffic congestion at the Blomquist <br /> �zas�oz�ns2�a2 11 <br /> n��85aR�o.�a�o <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.