My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-05-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:52:54 PM
Creation date
5/20/2004 4:23:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�.��2 <br /> Street and Maple Street intersection. This intersection will already operate at an <br /> ''?�% unacceptable level of senrice during the PM peak hour without the Project, and with the <br /> addition of Project-generated traffic, the intersection is expected to operate at <br /> unacceptable levels of service during both the AM and PM peak hours. (Secondary <br /> Impact 7-10A) <br /> Mitigation: The Project will be required to implement one of the three <br /> altemative plans for mitigating Impact 7-10A ident�ed in Secondary Mitigation 7-10A:'1) <br /> installation of four-way stop signs combined with widening of the northbound approach <br /> to include a dedicated left turn lane and a shared through/right-tum lane; 2) installation <br /> of a traffic signal at the intersection; or 3) installation of a roundabout at the intersection. <br /> Findings: Implementation by the project applicant of any of the three <br /> altematives described in Secondary Mitigation 7-10A is feasible and will reduce the <br /> impacts of the Project on the Blomquist StreeUMaple Street intersection, othervvise <br /> potentially significant, to a less-than-significant level. <br /> L. Proiect Imuacts on C/CAG's Conqestion Manaaement Plan Roadwav <br /> Network — PM Peak Hour <br /> Potential Impact: The Project is expected to generate approximately 909 <br /> net new peak-hour trips during the PM peak hour, making it subject to the requirements <br /> presented in the Ciry/County Association of Govemments of San Mateo County <br /> ("C/CAG") Guidelines for the Imp/ementation of the Land Use Component of the 1999 <br /> Congestion Management Program (Impact 7-11). <br /> Mitigation: The Project shall implement a TDM program that meets the <br /> requirements of Mitigation 7-2 and the C/CAG Guidelines for the Implementafion of the <br /> Land Use Component of the 1999 Congestion Management Program. The project <br /> applicant must secure approval of the TDM program from both the City of Redwood City <br /> and C/CAG prior_ to approval of any tentative subdivision map or development <br /> agreement for the Project (Mitigation 7-11). <br /> Findings: This mitigaticn measure is feasible and reduces the impact on <br /> the C/CAG plan described above to a less-than-significant level. <br /> M. Proiect Drivewav Safetv Imuacts <br /> Potential Impact: One or more of the Project driveway connections to <br /> Bair Island Road could be dangerous intersections, as described in Impact 7-12. <br /> Mitigation: The Project shall incorporate the tra�c safety design <br /> guidelines set forth in Mitigation 7-12 in finalizing plans for Project access. <br /> Findings: This mitigation measure is feasible and reduces the impact <br /> described above to a less-than-significant level. <br /> 1289\02N 79278.2 12 <br /> Atty/Reso/Reso.1470 <br /> 052004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.