Laserfiche WebLink
6.3.A. - Page 2 <br />impacts associated with the proposed installation including increased braking and <br />accelerating by vehicles and increased travel times. <br />If approved, installation of the new stop signs will begin within four weeks. <br />ALTERNATIVES <br />Council may choose to not approve the installation of the proposed stop signs, and <br />direct staff to investigate other options to address community concerns. <br />FISCAL IMPACT <br />The cost of stop -sign installation is approximately $2,500.00. Funds are available for <br />this purpose from the Gas Tax Construction Fund — Traffic Calming which has an <br />available balance of $268,381.19 as of May 31, 2011. Minor maintenance costs will be <br />incurred in future years. <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City has determined that the installation of stop <br />signs on Heller Street at Pine Street meets the California Environmental Quality Act <br />(CEQA) exemption criteria as set forth in Section 15301, ( "Existing Facilities "), as the <br />stop signs constitute a minor alteration of the existing public streets. Furthermore, this <br />project has been designed compliant with the city's standards and the Manual of <br />Uniform Traffic Control Devices. <br />. rd <br />S. Peter Vorametsanti, PE <br />Acting CDD Manager /City Engineer <br />Robert B. Bell <br />CITY MANAGER <br />ATTACHMENTS <br />1. Resolution <br />2. Location Map <br />