My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Pump Repair Service Company
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Pump Repair Service Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2011 2:27:30 PM
Creation date
8/31/2011 2:27:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pump Repair Service Company
PROJECT NAME
General Service Agreement for storm utility system pump stations: Pump, motor, and flap gate maintenance and repair services
RMP File Number
304
Date
8/22/2011
MO Ref
11-128
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. Check all aligning registers. <br /> f. . Dynamic balance impeller <br /> g. Replace bearings and seals. <br /> 4. When required, replace the following parts: <br /> a. 1 416 55 Line <br /> b. 1 416 SS Line Shaft <br /> c. 1 416 SS Head Shaft <br /> d. 1 Bronze Suction Bowl Bearing <br /> e. 1 Bronze Lower Bowi Bearing <br /> f. 1 Bronze Upper Bowl Bearing <br /> g. 2 Oil Tube Line Shaft Bearing <br /> h. 1 Top Oil Tube Tension Bearings <br /> i. 1 Shaft Lip Seal <br /> 5. All replacement parts must meet manufactures specifications. <br /> 6. Major parts such as bowis and impellers must be same as pump manufacturer. <br /> 7. All nuts and bolts to be 316 SS (stainless steel) <br /> 8. The City retains the right to inspect pumps during disassemble and inspection, and to inspect <br /> any and all replaced parts. <br /> B. Flaq Gate / Dreinaee eate. Materials, Reolacement. Reoair. And Installation <br /> 1. Proposer is responsible for the inspection, removal, repair or replacement of flap gates at the <br /> identified pump station locations. <br /> 2. Repairs, Replacements, Installation and materials will be to Redwood City Standards. (Listed <br /> below) <br /> a. All gates will be cast iron. <br /> b. All bushings and seats must be bronze. <br /> c. All assembly and all hardware will be 316 stainless steel. <br /> d. All nuts, bolts and washers will be 316 stainless steel. <br /> e. All hinge arms will be stainless steel. <br /> f. All gates and cast iron parts will be fusion epoxy coated. <br /> WfSTEWATEfl MANAGEMENT SEftVICES DIVISION Z <br /> . RFVSTORMUTILfTVSYSTEMPUMVSTATION-MAINTENANCEANDEMERGENCYSERVICESFORDUMPS,MOTORS,FLAP/DRAINAGEGA7E5 <br /> General Services Agreement between the City of Redwood City and Pump Repair Service Company 08/22/2011 <br /> Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.