My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 2. Carson Reservoir <br /> Consultant will develop the contract documents to seismically-upgrade Carson <br /> Reservoir. Two upgrades will be developed: <br /> . Roof upgrade for seismic loads. This may include retention of the existing roof <br /> diaphragm and roofing system; or replacement of part or all of the existing <br /> roofing system with a steel corrugated panei system. <br /> . Modify the alignment of an existing portion of the outlet pipe where it crosses <br /> over/under the nearby BDPL 3 and 4 pipelines. This reflects that a recent <br /> modification to this pipe put it over BDPL 3, resulting in an inverted siphon that <br /> limits access to the water in the lower part of the Carson reservoir. The new pipe <br /> alignment will be at a grade line to allow for access to all water in the reservoir <br /> via gravity flow. <br /> During the course of the design effort, Consultant expect to be informed as to whether <br /> portions (or all) of this work is co-funded by grants from FEMA. In order to ensure <br /> correct book-keeping for FEMA purposes, all costs associated with Task 3 will be <br /> tracked separately. <br /> Required Submitals: <br /> 25% and 50% Design Submittal and Review <br /> The final engineering and design will be performed to meet the intent of the ACI 318 <br /> and ACI 359 codes, complemented by IBC 2009, ALA (2005) and other industry <br /> documents as appropriate. Seismic response modification factors shall be no higher <br /> than allowed by code for new construction, or lower if existing detailing does not provide <br /> suitable ductility to meet the intended pertormance. <br /> Consultant shall submit final structural calculations, stamped and wet signed by a <br /> California Professional Engineer (Mr. Eidinger or Dr. Duggan for civil and structural <br /> work). <br /> Final drawings shall be in D size (24x36 inch) format. <br /> The potential list of drawings is listed in Table 3. <br /> ATTY/AGR/2012.001/G&E ENGINEERING Page 17 of 30 <br /> REV:01/10/12 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.