My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item Number of Potential Drawing List for Contract Documents <br /> Drawin s <br /> General 1 Structural, steel, concrete pipe and other key <br /> Notes s ecifications. <br /> Civil 1 Reservoir site la out, showin known i e locations <br /> Structural 5 Details of structural im rovements of the roof s stem <br /> Pipeline 1 Relocated pipeline plan and profile near BDPL 3 and <br /> 4 <br /> Total 8 <br /> Table 3. Carson Reservoir Drawing List (Potential) <br /> To the maximum extent, Consultant will re-use available Redwood City drawings (TIF <br /> and PDF as-builts) as background information, with new details to be shown on suitable <br /> new layers, and existing information shown "grayed". Site plans will be based on <br /> available information shown on available Redwood City drawings. New potholing or <br /> survey is not included as it is not warranted for the seismic upgrade work; but if deemed <br /> necessary for other purposes as may be required by Redwood City, then the additional <br /> survey work shall be negotiated or shall be provided by Redwood City. <br /> Consultant shall submit a 25% submittal which will include conceptual design sketches <br /> for the seismic upgrades. RWC will provide comments within 1 week of submittal. <br /> Consultant shall develop a 50% review set of drawings for the seismic upgrades and an <br /> outline of the construction specifications for submittal to Redwood City. The purpose of <br /> this submittal is to obtain Redwood City comments on the proposed designs, to assure <br /> compliance with project goals, and to determine conformance with Redwood City <br /> standards. <br /> Redwood City will provide Consultant with hard copy and electronic versions of <br /> standard specifications for similar designs developed by Redwood City. It is assumed <br /> that Redwood City has a recent underwater dive inspection for Carson reservoir, and <br /> will make the findings available to Consultant; if not, or for other reasons another <br /> underwater inspection is warranted, Consultant can organize an additional inspection <br /> (DiveCorr, estimated $4,000) as an optional task. <br /> Deliverables: <br /> • 25% conceptual design sketches. <br /> . Drawing list that identifies all proposed Drawings and Specifications to be <br /> delivered. <br /> . Location plan drawings for each site that show which major components <br /> are to be upgraded. <br /> . Drawings (11 x17) showing details of connections, foundations and anchor <br /> typicals (50% complete). Preliminary calculations (partial as available) <br /> • Overall scope of construction work — description and updated cost <br /> estimate. <br /> ATTY/AGR/2012.001/G&E ENGINEERING Page 18 of 30 <br /> REV:01/10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.