My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 G&E Engineering System Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 G&E Engineering System Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 3:00:33 PM
Creation date
2/21/2012 4:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
G&E Engineering System Inc.
PROJECT NAME
Design services Potable water system seismic Improvement Program
RMP File Number
304
Date
2/10/2012
MO Ref
12-021 amendment 14-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant shall submit a 25% submittal which will include conceptual design sketches <br /> for the seismic upgrades. RWC will provide comments within 1 week of submittal. <br /> Consultant shall develop a 50% review set of drawings for the seismic upgrades and an <br /> outline of the construction specifications for submittal to Redwood City. The purpose of <br /> this submittal is to obtain Redwood City comments on the proposed designs, to assure <br /> compliance with project goals, and to determine conformance with Redwood City <br /> standards. <br /> Redwood City will provide Consultant with hard copy and electronic versions of <br /> standard specifications for similar designs developed by Redwood City. Consuitant will <br /> provide all technical specifications. <br /> Deliverables: <br /> • 25% conceptual design sketches. <br /> . Drawing list that identifies all proposed Drawings and Specifications to be <br /> delivered. <br /> . Drawings (11 x17) showing details of restrains, anchors, and roof system <br /> improvements (50% complete). <br /> . Overall scope of construction work — description and updated cost <br /> estimate. <br /> . Proposed specifications and standards. Redwood City shall supply "boiler <br /> plate" sections of the specifications as commonly used for similar work by <br /> Redwood City, from which Consultant shall modify as needed for this <br /> project. <br /> 90% Design Submittal and Review <br /> Consultant shall develop complete (90%) design plans and specifications for the project <br /> for Redwood City final review. Detailed design shall conform to all applicable water <br /> industry codes and Redwood City design standards; and shall be stand-alone bid <br /> documents. As delivered, the 90% documents shall be ready for advertisement and <br /> competition, to the extent practical, subject to any changes the Redwood City may <br /> identify or limited open issues. <br /> Consultant shall prepare an updated draft Engineer's Cost Estimate for construction <br /> activities. <br /> Consultant shall perform an internal QA audit of the designs to assure that the designs <br /> meet the intended project goals in a cost effective manner. <br /> Consultant shall assist Redwood City in responding to the 90% Design Review <br /> Submittal comments from Redwood City Operations, Maintenance, and Engineering <br /> staff. <br /> The following design assumptions shall apply: <br /> ATTY/AGR/2012.001/G&E ENGINEERING Page 22 of 30 <br /> REV:01 /10/12 '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.