My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso12 PC 12-04 January 17 2012
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2012
>
Reso12 PC 12-04 January 17 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 9:27:47 AM
Creation date
3/26/2012 3:37:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
Planning Commission
Date
1/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
final site drawings, and all design criteria a specifications set forth in the <br />geotechnlcal reports will be implemented as a condition of project <br />approval, <br />17 The applicant shall install bicycle <br />Samson Street prior to issuance <br />project by the Building Department. <br />artment. <br />rots on site and bicycle parking on <br />o f a certificate of occupancy for this <br />18. The applicant shall install underground utilities a outlined in Redwood <br />City's New Development standards. <br />19-The median open o n Veterans B oulevard sha be sh ifted to <br />accommodate left turns into the proposed driveway. Based on the <br />queuing analysis for the northbound left turn pocket on Veterans <br />Boulevard into the project driveway, it Es estimated that the rrrinimu r <br />storage length should be 60 feet plus the bay, <br />20. The ap licantleontractor shall apply for a Construction I mprovement <br />Perm from the City's Engi need ng Division for work In the City public right- <br />of easements or property in which the City holds are interest, <br />including driveway, sidewalk, water service and c onnections, sewer <br />connections, sewer cieanout , curb drains, storm drain c onnections, <br />P G&E/TelephonelTV services <br />21.Ap licant shall repair and/or remove and replace all streets., sidewalks, <br />s, <br />and curbs & gutters In need of repair within and bordering the project in <br />accordance with the Ci ty's adopted E ngineering Standards adopted <br />December 4, 2006 Resolution Flo. 1 4750. <br />2. The applicant will condu a flow monitoring study of the existing <br />wastewater trunk pipelines that would serge the project to ensure that <br />available capacity i adequate to serge the project. An engineering report <br />documenting the findings of the flow monitoring study will be submitted to <br />the City for review prior to issuance of grading permits. I the event that <br />the flow monitori study determines that the existing 15" wastewater <br />pipeline capacity is inadequate, the applicant will be required to upgrade <br />the pipeline to the nit nearest wastewater trunk mainline to avoid <br />impacts to the wastewater transmission system. <br />23. Traffic control for lane closures shall conform to the Work Area Traffic <br />Control Handbook; street closures require prior submission of traffic <br />control plans to b approved in advance. <br />24- Applicant shall follow the " Guidelines for Residential <br />Development <br />I y <br />J■� � '�� T� 1L "�f 1/ 1 �1 1 { E � . 1 9111 - PD PERMIT 40 VETERANS <br />Page 7 of 1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.