My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso12 PC 12-04 January 17 2012
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2012
>
Reso12 PC 12-04 January 17 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 9:27:47 AM
Creation date
3/26/2012 3:37:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
Planning Commission
Date
1/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.'he applicant shall post Performance and Labor & Materials Bonds for all <br />improvements to be dedicated to the City. All work to be performed in the <br />public right of ay shall be reviewed and approved by the City under a <br />Construction Perot process. <br />26.The applicant is expected to pay all applicable water, recycled water, <br />wastewater, and transportation related fees at the time of the building <br />p <br />2 . The applicant shall pay for the Redwood City Parks fee at the the of <br />issuance of the building permit. <br />28. It is a requirement that the developer plans and designs their buildings to <br />be dual plumbed to provide for the internal use of recycled w ater and also <br />to provide for the use of recycled w for landscape irrigation. The use <br />of recycled w ater indoor as well as outdoor is necessary to satisfy the lack <br />of potable water suppl for the p roject. All grater conservation measures <br />must also be observed and implemented. <br />2. Because the site is greater than 1 Acre, the property owner shall file an <br />Idol and submit permit documentation through the State of California's <br />SMARTS system, consistent with California SWPPP requirements ents as <br />described in the State's Construction General Permit 010 -0014 DWQ. <br />30. Plans shall be designed to meet the G3 requirements ents of the Municipal <br />Regional Permit (M RP) P NPD S Permit CAS 612008. <br />31 . stormwater Pollution Prevention Program Best Management Practices <br />(E3MPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwat r Pollution Prevention Plan <br />(SWPPP). BMP plan sheets are available eleotronlcally for inserting 'Into <br />protect plans. <br />2.The property owner/applicant shall apply for and obtain a Grading Permit <br />from the Redwood City Engineering Division for any grading exceeding 50 <br />cubic cards. <br />33.Applicant hall complete the City's "I iPDES Permit Compliance Checklist ", <br />and provide for permanent stormwater control measures selected from the <br />City's "Local Source Control Measures List ", as appropriate. Refer r t <br />"Start at Source " a Manual by BASMMA for guidance regarding <br />appropriate story water treatment measures. <br />34. Normally scheduled construction activities shall adhere to the City's Noise <br />Ordinance. If possible, the noisiest construction activities would be <br />scheduled for daytime hours when the ambient noise levels are highest. <br />I-TTY/R , 1 111 -04 PD PERMIT 640 VETERANS <br />R E V:01 /1 211 <br />Page 8 Of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.