Laserfiche WebLink
DES:dft /21/95 (046/38) <br /> <br /> Noise impacts within the Project, after <br /> construction, shall be mitigated and <br /> reduced to an acceptable level by <br /> appropriate building design and <br /> insulation. <br /> <br />(5) Visual impacts from the Project <br /> shall be mitigated and reduced to an <br /> acceptable level by restricting the <br /> height of buildings to three (3) <br /> stories, the installation of dense <br /> landscaping around buildings and the <br /> periphery of the Property, and the <br /> installation of a landscape buffer along <br /> the southerly boundary of the Property; <br /> all of which mitigation shall be <br /> conditions of an architectural permit <br /> requisite for the Project. <br /> <br />(6) Impacts relating to public services and <br /> facilities have been, or shall be, <br /> mitigated by the payment of $1.6 million <br /> to GID 1-64 and by pertinent provisions <br /> of the 1995 Development Agreement. <br /> <br />(7) Impacts relating to fire services shall <br /> be reduced to an acceptable level by <br /> requiring the installation of sprinklers <br /> in buildings and otherwise requiring the <br /> construction thereof in accordance with <br /> <br /> <br />