My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Panamora Environmental, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 Panamora Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 12:34:45 PM
Creation date
5/7/2012 12:34:44 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Panamora Environmental, Inc.
PROJECT NAME
Environmental consulting-Laurel Way Project
RMP File Number
304.5
Date
5/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"to the extent feasible." This language, taken by itself, could be interpreted to suggest that full <br /> mitigation may not be feasible. <br /> Review the two geology measures and provide revised text regarding the feasibility of the <br /> measures. Review all other mitigation measures to ensure none of the other mitigation <br /> measures contain the qualifying language; measures would be revised to remove the qualifying <br /> language. <br /> Sub-task 3.2: Incorporate Average House Size Information <br /> Appendix C of the Final EIR identifies the building square footage of other homes in the vicinity <br /> of the proposed development. Correct the data in Appendix C to reflect the information in <br /> Heather Bradley's memo (dated July 27, 2011) on average house sizes. Add this information to <br /> the Errata. <br /> Sub-task 3.2: Incorporate Methodology for Alternative B FAR Formula <br /> Incorporate into the Errata a discussion of the methodology used to arrive at the Alternative B <br /> floor area ratio (FAR) formula. Supporting information from the General Plan regarding hillside <br /> development will be included as appropriate. <br /> Deliverable: The information discussed in the Sub-tasks above will be incorporated into the <br /> Errata sheet and will be submitted to the City within 3.5 weeks of the authorization to proceed. <br /> Responding to City comments will be conducted under Task 4. <br /> TASK 4: REVISE THE FINAL EIR <br /> Subtask 4.1: Prepare Administrative Draft Final EIR <br /> Prepare the Administrative Draft Revised Final EIR for City staff and legal review. The Revised <br /> Final EIR will include all sections in the first Final EIR. Key sections will be revised as directed <br /> by City. The new information will be presented in tracked changes for the Administrative Final <br /> and Check Final. The Revised Final EIR will show the changes to the Introduction, Errata, and <br /> References in underlined and ��e�# text. The document will include the results of the <br /> previous tasks and subtasks. Specific subtasks to perform to prepare the Revised Final EIR <br /> include: <br /> Introduction: <br /> 1. Update project history to describe what has happened since the Planning Commission <br /> approved the Final EIR (e.g., the appeal and the revised Project Description) <br /> 2. Provide a table and discussion that translates the old lot numbers from the Draft EIR to <br /> the new lot numbers presented in the revised project <br /> 3. Describe what is different in the Revised EIR <br /> Revised Errata: <br /> 1. Incorporate City comments on description of new project <br /> 2. Incorporate City comments on Revised Errata <br /> 3. Elimination of references to the Development Agreement <br /> ATTY/AGR/2012.035/PANORAMA ENVIRONMENTAL INC FOR LAUREL WAY PROJECT <br /> REV:04-20-12 VR <br /> Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.