My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-06-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-06-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 3:39:05 PM
Creation date
6/19/2012 1:35:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 3 <br /> installed along the 450-foot long shoreline. Handicap accessibility issues will also be <br /> addressed along the walkway and at the fishing pier. <br /> The Project incorporates other features relating to sea level rise, seismic safety, future <br /> electrical demands, and green building practices. A 9-foot high seawall along the 920' <br /> long shoreline is designed to take into account extreme high tides, storm surge and sea <br /> level rise predictions for the 50-year life of the project. The seawall is also designed to <br /> allow for a 2-foot height extension of new seawall to be added at a later time, if <br /> necessary. BCDC's Engineering Criteria Review Board required installation of seismic <br /> instrumentation and recording equipment that will be monitored by the California <br /> Department of Conservation's Strong Motion Instrumentation Program. In consideration <br /> of future potential regulations controlling ship emissions while at berths, additional <br /> shore-to-ship electrical service will be installed at the new wharves. The contractor is <br /> encouraged to reuse and recycle as much of the demolition materials (concrete, <br /> asphalt, timbers). However, most of the wood waste is contaminated with creosote or <br /> lead paint. The new longshoremen's support building will be constructed with energy <br /> efficient LED lighting, rigid insulation, and ability to add solar panels to the roof. <br /> ANALYSIS <br /> The Project is necessary for the Port to secure its future economic viability. The new <br /> wharf will improve efficiency and increase cargo throughput. The plans for the Wharves <br /> 1&2 Project estimate that the tonnage throughput capacity at the facility will increase by <br /> approximately 118 percent as a result of the reconstruction of the Wharves. In addition, <br /> this Project will enable landside improvements to the terminal area by the user that will <br /> further increase capacity by an additional 73 percent. The dollar amount resulting from <br /> increased throughput is difficult to estimate, but it will significantly increase the current <br /> revenue from this facility of $1.4 million. <br /> Currently the demand for construction materials is increasing. The construction <br /> aggregates imported from British Columbia through Wharves 1& 2 are expected to <br /> increase again next year from this year's volume of 800,000 metric tons to over 1 million <br /> metric tons. Cement imports are forecasted to resume in 2014 and the Project will allow <br /> a cement ship and an aggregate ship to be at berth simultaneously whereas only one <br /> ship can be handled at the existing Wharves 1& 2. In the future, the Project will allow <br /> the flexibility to handle other cargoes such as those requiring mobile cranes on the <br /> wharf for loading/unloading. On the upland portion of the Project, the new and <br /> improved utilities will allow for continued Port development and the new seawall will <br /> protect the Port's landside terminal area from flooding. <br /> The Project will create and sustain construction jobs in the community. Tax revenue will <br /> be generated from sales of the construction materials handled by the new Project. <br /> Limited industrial-use land will be better utilized. The public access improvements <br /> associated with the Project will provide better and more attractive walkway access along <br /> the waterfront and to the popular public fishing pier. <br />
The URL can be used to link to this page
Your browser does not support the video tag.