My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-06-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-06-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 3:39:05 PM
Creation date
6/19/2012 1:35:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 6.1. E. - Page 12 t <br /> during canstruction.. The Redwood City Fire Depaxtment reserves the right ta reject az�y and <br /> all itenns which �ail to qualzfy. <br /> 1.2 Bids • ' <br /> ; <br /> L2.1 Not Applicable. � <br /> 1.3 Warran and Service: ! <br /> 1.3.1. All r�pairs and/or replacements shall be made at no cost whatsaever and to the ; <br /> cozz�plete satisfactian of the Redwood City Fire De�artment within the �'irst year. The <br /> guarantee shall not ca�e:r breakage or damage caused by acts of God, neglect, masuse or � <br /> vvrecking caused by actual use, collision or carelessness on the part of athers than the <br /> manufactiurer after the vessel k�as been accepted by the Redwood City Fire Department, The ; <br /> contractor shall also guarantee fihat the hull has been tested and compliant in accordance with , <br /> ABS welding standairds. <br /> 1.4 Service Facility/Warrantv Repaixs: <br /> 1.41 The Redwood City Fire Departrnenti is extremely concerned with purchasing the �essel ! <br /> from a manufacturer who can provide the necessary service after the acceptance o� the � <br /> vessel. With this in mi�d, the successful bidder must be able to provide warranty service in <br /> San Mateo, San Francisco, Alameda, Marin, or Contra Costa County, California. (No ' <br /> Excepfions) � <br /> 1.5 Warranty• <br /> 1.5.1 Warranty coverage and duratioz�s are detailed in Section 3 o�this dacument. � <br /> 1.10 Start o� Warranty Period: ' <br /> — <br /> 1.10.1 All warranties shal� coznmence on completion of training and acceptance tests of <br /> �essel with the Redwood City Fire Departtilent. The manufacturer shall be notif ed by U. S. <br /> Mail of'th� date of acceptance. <br /> i Section Z- Cont�ac�or's Responsibilities and Requi�ements , <br /> � 2A Time o�' Delivery: <br /> 2.0.1 The successful bidder, after issuance of Notice to Proceed, shalI diligently ensuxe that <br /> the vessel is fu11y equipped, constructioi7 completed, and deliv�red to the Redwood City Fire ' <br /> j Dep�ment wit�iin 3b5 days. <br /> � 2.1 Quali�cations of Bidders: <br /> 2.L1 Each Bidder sha11 furnish satisfactory evidence that it has az�. opexational facility ' <br /> adequate for the manufacture of the vessel that it intends to furnish as well as documented <br /> experience of canstruction, delivery, and success�u� opexatzon o� a vessel af similar <br /> type/make �or ten (10) years. Each biddcr shall Furnish a stateinent of quali:C�ca�.ion and <br /> descxiption of project organizational management structure/personnel for this project. Bidder <br /> sha11 also ider�tify iiz w�iting of any pending litigation. � <br /> 2.1..2 Each bidder shall conform 1;o all the requir�ments associated with the FEMA �'ort <br /> Security Grant Guzdeli�es. Redwaod FD to provide details 2.2 Deli�ery of Eauinment: � <br /> 2.2.1 Delivery of the vessei shal� be accompanied by any outstanding invoice{s) and shall be � <br /> identified wzth a Purchase Order Nurnber and Vessel Identification Number. The receipt of ! <br /> , #he vessel, manuals, instruction, and certification ofprescribcd fests vvi11 constitute deli�very. ' <br /> At the presentation of payment, the biddex sha11 produce �. Manufacturer's Certificate af <br /> Origin. D�livery o�t�e vessel incomplete or requiring changes/modi�'ications shal� be <br /> unacceptable and shall be considered a breach of contract. � <br /> 2.3 En ineerin Conferences: ' <br /> � 2.31 Prior to the start of construction of the vesse� subject to thxs specification, the cantractor <br /> shail schedule an �n.giz�eezi��g Conferencc at the manufacturer's factory with f ve (5} afficials � <br /> of the Redwood City Fire Departmei�t and or their designees to review in detail the necassary , <br /> dra�vings, designs, measureme��ts, etc., and samples of welds that may be required to , <br /> 3 �, <br /> ATTY/AGR/2012.076/METALCRAFT MARINE <br /> REV:06-13-12 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.