|
i
<br /> �
<br /> ;
<br /> ` 6.1. E. - Page 13 '�,
<br /> � fabricate the ves�ei. The design of tl�e steering control consale shall be reviewed for '
<br /> ,
<br /> approval at the conferenc�. j
<br /> 2.3.2 The Engineering Conference shall be scheduled within �orty five (45) days from the �
<br /> ; recei�t of award of contract. Subsequent conferences for construction inspectioza az�d '
<br /> I ov�rsight, maximum of two (2) additional visits to factory b� three 3S) Redwood Gity �ire
<br /> I Department of�'icials or their designees, sha11 be scheduled at �o less than twenty one (21) '
<br /> I
<br /> ca�endar days notice to tk�e parties involved. The first inspection shall talce place when �
<br /> construction of the hu11 and superstructure is subsequ�ntly complete and er�gz��es, gears, and ��
<br /> � shafts insfall�d, but prior to closing of any permanent void spaces. The second inspection '
<br /> shall take place during tests and trials. Failure on the part o� tk�e contractor, without the ,
<br /> � express written appro�al of the Redwood City Fire Department, to schedule t�ese inspectians
<br /> ' will result in fhe rej�ction of f1�� vess�l �.rpon delivery, The Redwaod City Fire Department �
<br /> � �as the xight to make any add'ztionaX inspections, with travel expenses paid for by the �
<br /> i Redwood City Fire Department.
<br /> 2.3.3 The cantractor shall assume a11 expenses, for Redwood City Fire Department officials
<br /> ar tl�.eix designees (ma.xiinuaxi o���ree (3) persons per site visit) for the three (3) required �
<br /> conferences/inspections abovernentioned to the place of vessel manufac�ure, incurred for i
<br /> food, lodging, and commercial air and ground transportation from SFO Internatianal Aixport.
<br /> ' The co�tractor s�alX provide a c�eaa�, well-]zt e�vironment in which to conduct the inspections '
<br /> of the vessel during construction. All warlc shall be compieted and the vessel shall be clean
<br /> and prepared for inspection prior ta the scheduled inspection date.
<br /> 2.3.4 The vessel will not be accepted upon delivery if the vessel is incomplete. The vesseI !
<br /> wiXl not be accepted upon delivery i�the �essel is not in accordance with these specifications,
<br /> or fails to zneet any o1F the tests prescxzbed in lhese specifications, or the confracfor fails to �
<br /> , provide the rec�uired inspcc�ions. !
<br /> 2.4 Detail Drawin�s and Bluenrints: !,
<br /> z.4.1. A cox�aputer generated drawing or blueprint sha11 b� prepared by 1:he contractor and '
<br /> ' s�ibmitted �o the Redwaod City Fire D�partment a minimmn of ten (10) days prior ta the ,
<br /> Engineering Conference. The oxigzna� copies o� any drawings shall be reviewed, approved,
<br /> � and signed by an appropriate official of the Redwood City Fire Department prior fo any
<br /> construction of asiy part of the vessel subject to these specifical;ions. The purpose o�tk�ese
<br /> drawings is to assure 1;he Redwood City I'ire Departmenf that the proposed design provides a '
<br /> satisfactory arrangement meeting the intent of these specifications. The drawings must be !
<br /> drawn to scale and include: ;
<br /> 2.4.1 A Inboard and o�tbaard profile and decl� arrangements, with diinensions,
<br /> demonstrating pil�thouse visibility, operational ares or monitors, compliance wzth Rules of �
<br /> . the Raad rec�uirements for navigationallights.
<br /> E 2.41 B Si;ructural con�iguration demonstrating compliance with tl�e technical specifications. '
<br /> 2.4.1 C Arrangement nf propulsion units, gears, propulsors, .Czxe puinps, generator, fuel tanks,
<br /> - cambustion air clucting, water tan1�, fire main and exhaust piping runs, demo�strating ability
<br /> to access and remove componants I'or maintenance and rep�ir.
<br /> � 2.4.1 D One�line schematic diagrams o� the fire mains, elec�rical, circulating and caoling, I
<br /> � fluids, and fuel and oil systems. ',
<br /> 2.�.1 E Design of the control console, including arrangement af electronics equipment.
<br /> 2e4.2 Upan successful completion of the �'irst Engineering Con�'erence, the Redwaod City
<br /> Fire Depa�rtment will xequzre a�y x�ecessary ch�x�.ges determined prior to, during, or aftar the
<br /> conference to be madc to the vessel design drawings. Any ck�anges must be detailed and
<br /> depicted in the "Final Dxawings". Tk�e cont�ractox shail provide the Redwood City Fire
<br /> Depaztzx�ent wii.h three {3) sets of final drawings aft�r the Engineerir�g ConFerence. Sefore
<br /> construetiion �na� �tart, the Redwood Ci�y Fire Department wiII si�n/approve t�e "Final '
<br /> ;
<br /> 4 '�
<br /> ATTY/AGR/2012.076/METALCRAFT MARINE ;
<br /> , REV:06-13-12 VR
<br /> , �
<br />
|