Laserfiche WebLink
i <br /> � <br /> ; <br /> ` 6.1. E. - Page 13 '�, <br /> � fabricate the ves�ei. The design of tl�e steering control consale shall be reviewed for ' <br /> , <br /> approval at the conferenc�. j <br /> 2.3.2 The Engineering Conference shall be scheduled within �orty five (45) days from the � <br /> ; recei�t of award of contract. Subsequent conferences for construction inspectioza az�d ' <br /> I ov�rsight, maximum of two (2) additional visits to factory b� three 3S) Redwood Gity �ire <br /> I Department of�'icials or their designees, sha11 be scheduled at �o less than twenty one (21) ' <br /> I <br /> ca�endar days notice to tk�e parties involved. The first inspection shall talce place when � <br /> construction of the hu11 and superstructure is subsequ�ntly complete and er�gz��es, gears, and �� <br /> � shafts insfall�d, but prior to closing of any permanent void spaces. The second inspection ' <br /> shall take place during tests and trials. Failure on the part o� tk�e contractor, without the , <br /> � express written appro�al of the Redwood City Fire Department, to schedule t�ese inspectians <br /> ' will result in fhe rej�ction of f1�� vess�l �.rpon delivery, The Redwaod City Fire Department � <br /> � �as the xight to make any add'ztionaX inspections, with travel expenses paid for by the � <br /> i Redwood City Fire Department. <br /> 2.3.3 The cantractor shall assume a11 expenses, for Redwood City Fire Department officials <br /> ar tl�.eix designees (ma.xiinuaxi o���ree (3) persons per site visit) for the three (3) required � <br /> conferences/inspections abovernentioned to the place of vessel manufac�ure, incurred for i <br /> food, lodging, and commercial air and ground transportation from SFO Internatianal Aixport. <br /> ' The co�tractor s�alX provide a c�eaa�, well-]zt e�vironment in which to conduct the inspections ' <br /> of the vessel during construction. All warlc shall be compieted and the vessel shall be clean <br /> and prepared for inspection prior ta the scheduled inspection date. <br /> 2.3.4 The vessel will not be accepted upon delivery if the vessel is incomplete. The vesseI ! <br /> wiXl not be accepted upon delivery i�the �essel is not in accordance with these specifications, <br /> or fails to zneet any o1F the tests prescxzbed in lhese specifications, or the confracfor fails to � <br /> , provide the rec�uired inspcc�ions. ! <br /> 2.4 Detail Drawin�s and Bluenrints: !, <br /> z.4.1. A cox�aputer generated drawing or blueprint sha11 b� prepared by 1:he contractor and ' <br /> ' s�ibmitted �o the Redwaod City Fire D�partment a minimmn of ten (10) days prior ta the , <br /> Engineering Conference. The oxigzna� copies o� any drawings shall be reviewed, approved, <br /> � and signed by an appropriate official of the Redwood City Fire Department prior fo any <br /> construction of asiy part of the vessel subject to these specifical;ions. The purpose o�tk�ese <br /> drawings is to assure 1;he Redwood City I'ire Departmenf that the proposed design provides a ' <br /> satisfactory arrangement meeting the intent of these specifications. The drawings must be ! <br /> drawn to scale and include: ; <br /> 2.4.1 A Inboard and o�tbaard profile and decl� arrangements, with diinensions, <br /> demonstrating pil�thouse visibility, operational ares or monitors, compliance wzth Rules of � <br /> . the Raad rec�uirements for navigationallights. <br /> E 2.41 B Si;ructural con�iguration demonstrating compliance with tl�e technical specifications. ' <br /> 2.4.1 C Arrangement nf propulsion units, gears, propulsors, .Czxe puinps, generator, fuel tanks, <br /> - cambustion air clucting, water tan1�, fire main and exhaust piping runs, demo�strating ability <br /> to access and remove componants I'or maintenance and rep�ir. <br /> � 2.4.1 D One�line schematic diagrams o� the fire mains, elec�rical, circulating and caoling, I <br /> � fluids, and fuel and oil systems. ', <br /> 2.�.1 E Design of the control console, including arrangement af electronics equipment. <br /> 2e4.2 Upan successful completion of the �'irst Engineering Con�'erence, the Redwaod City <br /> Fire Depa�rtment will xequzre a�y x�ecessary ch�x�.ges determined prior to, during, or aftar the <br /> conference to be madc to the vessel design drawings. Any ck�anges must be detailed and <br /> depicted in the "Final Dxawings". Tk�e cont�ractox shail provide the Redwood City Fire <br /> Depaztzx�ent wii.h three {3) sets of final drawings aft�r the Engineerir�g ConFerence. Sefore <br /> construetiion �na� �tart, the Redwood Ci�y Fire Department wiII si�n/approve t�e "Final ' <br /> ; <br /> 4 '� <br /> ATTY/AGR/2012.076/METALCRAFT MARINE ; <br /> , REV:06-13-12 VR <br /> , � <br />