My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-22- <br /> 8.A. - Page 111 <br /> replanting of a minimum af one new tree for each tree removed is a general <br /> condition of a tree remova.l permit. The applicant has proposed a replacement <br /> program for tree removai at a ratio of appraxima#ely S to 1. <br /> Finding: Implementation of MM BIO -- 3 wou�d reduce impacts fram removal af mature <br /> trees and reduce impacts to existing trees to be preserved. <br /> Facts in Support of Fiading: Implementatian of MM BIO—3 wauld reduce impacts fram the <br /> loss of mature trees by requiring planting of rep�acement trees, as described in <br /> Section 2.6�-Bialogical Resources of the Draft ETR on pages 92-104, which is <br /> hereby incorporated by reference. <br /> Tuzpact: Impact BIO—4: Project grading and ather constrt�ction activity has the potential <br /> to disturb trees intended ta xemain. <br /> � <br /> Mitig�tion: NiM BIO - 4: The app�icant shaIl fund t7ze preparatian and implementation of a <br /> Tree Protection Plan prepared by a certified arborist to ensure protection af trees <br /> to remain. The Tree Pratection Plan shall include #he following protectian <br /> meas�res: <br /> I, Before start of any clearing, excavation, constructian or other work an �he <br /> site, every pratected tree ("protected" means designed to be retained on <br /> the project site) deemed to be patentially endangered by sa�d site wark <br /> shall be secure�y fenced off at a distance from the base of the tree to be <br /> determined by the Arborist. Such fences shall remain in place for duration <br /> of al� such work. All trees to be remaved shaYl be clearly marked. A <br /> scheme shalI be established for the remova] and disposal of Iogs, brush, <br /> earth, and other de�ris tn avoid injury to any protected tree. <br /> 2. Where proposed deve�opment or other site work must encroach upon the <br /> pratected perimeter of any protected tree, special measures sha�l be <br /> incorporated to allow the roots to breathe and vbtain water and nutrients. <br /> Any excavation, cutting, filling, or compacfion of the existing ground <br /> surface within the prvtected perimeter shall be minimized. Na change in <br /> existing ground level shall occur within a distance to b� determined by the <br /> Arborist fram the base of any protected tree at any time. No burning or <br /> use of equipment with an open flame sha2i occur near or within the <br /> protected perimeter of any protected tree. <br /> 3. No storage or dumping of oil, gas, chemicals, or other substances that may <br /> be harmful to trees shall occur within the distance to be deternuned by the <br /> Arborist from the base of any protected trees, or any other location on the <br /> ATTY/RE50.2253/ATTACHMENT 1 FINGER CERTlFYIIVG FINAL EIR-PC <br /> REV:106-14-12 VR <br /> Page Z 0 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.