My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-24- <br /> 8.A. - Page 113 <br /> l0. Prior to the conveyance of any lot, as�d prior to the release of the <br /> subdivision �nancial guarantees, the Arborist shall inspect tl�e individual <br /> lot and the overall project, respectively, to confirm that all tree pratection <br /> measures, including any post construction requirements, such as aeration, <br /> rnutch beds, and fertilization, have been sa#isfactorily comp�eted. <br /> ll. Roat Pruning. During and upon completion of any trenching/grading <br /> operation within a tree's dripline, shou2d any roots greater than one inch <br /> (1") in diameter be damaged, broken ar severed, root pruning to inclnde <br /> flush cu#ting and sealing of expasea roots should be accampiished under <br /> the supervision of a qualified Arborist ta minimiz� root deterioratian <br /> beyond the soil Iine within twenty-four hours. <br /> 12. Pruning. Pruning of the foliar canapies to include remaval of deadwoad is <br /> recommended and shouId be initiated priar to constauction operatians. <br /> � Such pruning wiil provide any necessary construction clearance, will <br /> Iessen the Iikelihood or potential far limb breakage, reduce `windsail' <br /> effect and provide an environment suitable for healthy and vigorous <br /> growth. <br /> �3. Fertitization. A program of fertilization by means of deep roat soil <br /> injection is recommendec� with app�ications in spring and summer for <br /> those trees to be impacted by construction. Such fertilization will serve to <br /> stimulate feeder root development, offset shock/stress as related to <br /> construction and/or environmental factors, encourage vigor, al�eviate soil <br /> compactian and campensate fox any encroachment of natural feeding root <br /> areas. Inception of this ferti�izing program is recommended prior to the <br /> initiation of construction activity. <br /> 14. Irrigation. A supplementaI irrigation program is recammended for ail trees <br /> (excZuding oak species} arid should be accompIishe� at reguiar three to <br /> faur week interva2s during the periad of May 1 through October 31. <br /> Irrigation is to be applied at or about the `dripline' in an amount suffzcient <br /> to supply approximately fifteen (15) gallons nf wa#er far each �inch in <br /> t�nk diameter. Irrigation can be provided by means of a soil needIe, <br /> `soaker' or permeab�e hose. When using `soaker' or permeahle hflses, <br /> water is to be run at low pressure, avoiding runoff/puddling, aliowing the <br /> needed moisture to penetrate the soil ta feeder root depths. <br /> 15. Mulch. Mulching with wooc3 chips {maximum depth three feet}within tree <br /> enviranments (outer foliar perimeter} will lessen moisture evaporation <br /> ATTY/RE50.2253/ATTACHMEIJT i FINGER CERTIFYING F1NAL�IR-PC <br /> REV:106-14-12 VR <br /> Page!2 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.