Laserfiche WebLink
-25- <br /> 8.A. - Page 114 <br /> fram soi1, protect ar�d encourage adventitious roots and minimize possible <br /> soil cornpaction. <br /> Finding: Imp�ementation of MM BIO — 4 would reduce impacts to existing trees to be <br /> preserved to a�ess than significa,nt level. <br /> Facts 'tn Support of Finding: Implementation of MM BI4—4 wou�d reduce impacts to existing <br /> trees to be preserved by implementing tree pratection measures, as described in <br /> Sectian 2.6—BiologicaI Resources of the Draft EIR on pages 92-104, ana Section <br /> IV — Appendices of the First Amendment to the Draft EIR, Appendix A Tree <br /> Surv�y c�ated February 10, 2012 by Kevin Kie�ty, Certified Arborist WE#047bA, <br /> which are hereby incarporated by reference. <br /> Cnitural Resources <br /> Imp�ct: Impact CUL — 2: While the project would nat resnit in a significant impact to <br /> the Finger Fazm House setting, which has already been compromised when the <br /> farm was removed, the project has the potential ta cause indirect adverse changes <br /> to the Finger Farm House's setting through the introduction of new visual <br /> elements in the vicinity of the structure. <br /> Mitigation: MM CUL — 2: The project applicant shall instal� screening vegetation along the <br /> project site's westerty property line that within 2 years wiIi reach a minimum height <br /> of 16 feet and which shal] be of a species type, as indicated in Figure 2.1-5 <br /> Preliminary Landscape Plan, that will complete2y block views of the entire project <br /> from the adjacent Finger Farm House year-round. <br /> Finding: Implementation of MM CUL — 2 would further re�uce indirect impacts to the <br /> adjacent Finger Farm House belaw a�ess than significant level. <br /> Facts ip Suppart of Finding: Implementation of MM CUL — 2 would screen #he new homes <br /> witlz vegeta.tion planted along the praperty line so that the homes wouid not <br /> substantially cantribute to the Finger Farm House setting as described in Sec#ion <br /> �.1 — CuZtural Resources of the Draft EIR on pages 32-q�9, which is hereby <br /> incorporated by reference. <br /> Impact: Impact CUL — 4: Future development under the proposed project could result in the <br /> exposure or destruction of subsurface archaeological resaurces. <br /> Mitigation: MM CUL — 4: A qu$lified professional shall prepare and implement a Cultural <br /> Resources Management Plan (CRMP) ta ensure that the proposed project woutd <br /> ATTY/RES0.22531ATTACHMEN71 FING�R CER7IFYING FINAL E!R-PC <br /> REV:106-14-92 VR <br /> Page 13 of 23 <br />