My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-90- <br /> ATi 8.A. - Page 179 <br /> b. The #ollowing additional information shall be submitted with #he post- <br /> construction stormwater mar�agement plan: <br /> {i} Detailed hydraul�c sizing calculations far each stormwater treatment <br /> measure proposed; and <br /> (ii) Poilutar�t removal information demonstrating t�at any proposed <br /> manufactured/ mechanical (i.e. non-landscape-based) stormwater <br /> treatment measure, when not used ir� comb�nation with a <br /> landscape-based treatme�t measure, is capable of remo�ing the <br /> range of pollutants typicafly remo�ed by fandscape-based trea#ment <br /> measures and/or th� range of pollutan#s expected to be generated <br /> by the project. <br /> c. All proposed stormwater#reatment measures shall incorporate apprapriate <br /> planting materials for stormwater treatment (for landscape-based <br /> #reatment measures} and shafl be designed with consideratiorrs for <br /> ►rectarlmosquito control. Praposed planting materials for all proposed <br /> landscape-based stormwater treatment measures shaf I be included on the <br /> landscape and irrigatior� plan for the proj�ct. The applica�t is not required <br /> to inc�ude on-site stormwater treatment measures in the pos#-construcfion <br /> stormwa#er managemer�t plan i� �e or she secures approval from the City <br /> Er�gineer of an alfernative proposal tha# demonstrates compfiance with the <br /> requirements of the Provision C.3 vf the National Pollutant Discharge <br /> Elimina#ion System (NPDES) permit issued to the San Mateo Countywide <br /> Clean Water Program. <br /> d. Applicant shalf enter into a Stormwater Trea#ment Measures Maintenance <br /> Agreement, in accordance with Provision C.3.e of the NPDES permit, <br /> which agreement shall provide, among other#hing, that: <br /> (f) The applicant accepts responsibility for the adequate instaliation/ <br /> cor�struction, operatian, maintenance, inspection, and reporting of <br /> any on-site stormwater treatment measures being incorporated in#o <br /> tF�e project until the responsibility is IegaNy transferred to another <br /> entity; and <br /> (ii) The ap�licant provides and ensures legal access to the on-site <br /> stormwater treatment measures for representatives of the City, the <br /> iocal vector cantro� district, and s#aff of the Regional Water Quality <br /> Control Board, Sar� Francisco Region, tor the pucpose of verifying <br /> the imptementation, operation, and maintenance of the on-site <br /> 5tormwater trea#ment measures and taking corrective action if <br /> necessary. The agreement shall be reviewed and approved by #he <br /> City prior to recordation and recorded a# the Cour�ty Recorder's <br /> Office at the appficant's expense. <br /> 3fi.Applican# shal� submit an Etosion and Sediment Control Plan to the City <br /> Engineer for re�tew and approval prior to commencing any work on the <br /> A7TY/RES0.2255/ATTACiiMENT 1 FINGER VESTING TENTATIVE MAP-PC <br /> REV:06-14-12 VR <br /> Page 'f 3 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.