Laserfiche WebLink
-92- <br /> Ar 8.A. - Page 181 <br /> may be used if necessary. At feast one {7) copy of the stamped approved <br /> pfans, along with the Co�ditions of Approval, shall be available for review at <br /> the job site at aH times. <br /> 43.Applicant shal! submit a Traffic Control Plan to the City Engineer for review <br /> and approval prror to commencing any work on #he project, incltading <br /> demolition or grading work, for controf procedures during the construction of <br /> #he project. The Plan shal� ir�clude at least the fol�owing: the route(s) that <br /> construction trucks shal! use ta access #he property, identification of the <br /> access point(s) to the si#e, any proposed staging area for trucks waiting to <br /> enter the site, traffic management for any work within the improved portion of <br /> a public right-of-way, ar�d any proposed #raffic controls, such as #he use of <br /> flag perso�s, to er�scare tf�e safe entry and exit of trucks accessing tt�e praject <br /> site. Throughout the construction period for the pro�ect, the applfcant must <br /> faithfc�lly implement the approved Tra�c Control Plan. <br /> 44.Applicant shall, prior to commencing any grading or building demali#ion, <br /> consult wit� County Environmental Health regarding vector con#rol fo reduce <br /> the displacement of mice and rats from th� project si#e to adjaoent properties, <br /> The permittee shall carry out a program of vec#or reduction within 3Q days of <br /> commencing construction acti�ities. Additionally, the applicar�t shall distribtate <br /> information to properties within 300 feet of the project site boc�ndaries with <br /> informatian about wna# to cl�eck to �educe the likelihood of vectors entering <br /> their property and buildi�gs, <br /> 45,Applican# shall, prior #o the issuance of any demoli#ion, building, or grading <br /> permit, submit a constructior� staging plar� for the rev�ew a nd approval of the <br /> C�ty Engineer andlor Chief Building Official or designee. The plaR shall show <br /> where construction materials will be stockpiled prio r to use, where <br /> construction debris will be colfected, how frequently the debris will be <br /> removed, and wf�ere parking wil! be �rovided for construction equipment and <br /> construction workers. Constr�ction activity an the project site shall be �n <br /> campliance with the appro�ed construction staging plan <br /> 46.The access roadway sha11 be constructed and #he fire hydrant(s) installed, <br /> functional and found satis�'actory by the Fire Departrnent befvre any <br /> combustible bc�ilding materials are brought on site ar befare buildin� <br /> inspectior� of the first building #oundation, whichever occurs first. <br /> 47.The number and location of fire hydrants shall na# be less than required by the <br /> Uniform Fire Code. These shail be shown on the impravement plans and <br /> canstructed as part of the subdi�ision im�ro�ements. <br /> 48.Each of the houses in the de�elopment s�all have an approved automa#ic fre <br /> sprinkler system installed, in accordance wi#h Redwood City Ordinance 2326. <br /> ATTY/RE5D.2255/ATTACHM�NT 1 FINGER 1l�5TiNG 7ENTATIVE MAP-PC <br /> REV:06-�412 VR <br /> Page15of1B <br />