My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Pacific Shores Center
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Pacific Shores Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 3:04:06 PM
Creation date
8/28/2012 3:04:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Shores Center
PROJECT NAME
Development Agreement for Pacific Shores Center
RMP File Number
304
Date
10/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(Pub. Res. Code §§ 21000 et seq.), and reviewed and considered by the City Council of <br /> City prior to approving the Project, the E�sting Approvals and this Agreement. <br /> Project Open Space. That portion of the Project site to be used primarily to open <br /> space and recreational uses, along with complementary facilities, including the Waterfront <br /> Park, the Playfields, the Berm, pedestrian, cycling and other trails and paths and specialized, <br /> complementary accessory uses and structures within the Project Open Space, all of which is <br /> intended for the benefit of the occupants of the Project and some of which is specifically <br /> intended to benefit the general public, and all of which is intended to remain in private <br /> ownership. The Project Open Space consists of portions of the Common Parcels and the <br /> Accessory Building Parcels. <br /> Project Site or Site. The Property. <br /> Property. The real property more particularly described in Exhibit A on which <br /> Pacific Shores intends to develop the Project. <br /> Public Facilities. The Seaport Boulevard Improvements and the Water and Sewer <br /> Facilities and the Storm Drainage Joint Facilities. <br /> Seaport Boulevard Improvements. All those improvements to and adjacent to the <br /> roadway generally known as Seaport Boulevard from Seaport Court to the Project Site <br /> planned and designed to provide access and utilities to the Project Site via a 4-lane <br /> landscaped roadway adjacent to, east of and separated by a landscaped median from the <br /> existing 2-lane roadway (the latter being refened to herein and in the Exchange Agreement as <br /> the Frontage Road), including resurfacing of the Frontage Road, all in accordance with <br /> Existing Approvals and the Exchange Agreement, and including new and/or relocated utilities <br /> and facilities connecting from the Other City Facilities to the Pacific Shores Infrastructure or <br /> otherwise required for development of the Project Site, including without limitation, <br /> acquisition of land or interests therein as necessary, curbs, gutters, roads, water lines, sanitary <br /> sewer lines, force mains and pump or lift stations, storm drainage catch basins, lines, force <br /> mains, retention basins; culverts and ditches, and pump stations, traffic signs, traffic signals <br /> and lane striping, sidewalks, bicycle paths and landscaped borders and medians, irrigation <br /> lines, street lighting, gas, electricity, cable television and fiber optic lines, spare conduits for <br /> future use and relocated utilities, including relocation of high-voltage power lines, all to be <br /> located within a City right-of-way (held by easement or owned in fee) and to afford service to <br /> the Project Site and, as the City shall determine, to other properties served by the right-of- <br /> way. The Seaport Boulevazd Improvements are illustratively depicted on Exhibit B-6. <br /> Storm Drainage Joint Facilities. The stormwater pump station on the Project Site to <br /> serve jointly the Seaport Boulevard Improvements and the Project Site and that storm <br /> drainage line, appurtenances and outfall to be installed for discharge of stormwater to <br /> Redwood Creek from such pump station to and within that access and utilities easement <br /> across the pazcel owned by RMC Lonestar held by Pacific Shores and recorded at Page Reel <br /> 7791 Image 1188, at Paragraph 2, with Legal Description at Page Reel 7791 Image 1199, to <br /> R:\DOC\0002\0033\AGA\CITY.DA6 � 39-Dec-1998 AT 15:00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.