Laserfiche WebLink
8.A. - Page 85 <br /> ATTACHMENT3 <br /> 41. No materials or equipment shall be stored on the improved portion of any <br /> public roadway at any time. <br /> 42. Prior to the end of each work day during construction, the contractor or <br /> contractors shall pick up and properly dispose of all litter resulting from or <br /> related to the Project, whether located on the property, within the public <br /> rights-of-way, or properties of adjacent or nearby neighbors. <br /> 43.The Project is subject to the impact fees which were in effect and applicable <br /> to the Project when the Vesting Tentative Map is submitted and found <br /> complete which include but are not limited to: traffic impact fees, school fees, <br /> water treatment fees, sewer fees, and parkland in-lieu fees. All such fees <br /> shall be paid at the time of issuance of building permits. The amount of the <br /> impact fees shall be determined at the time of payment in accordance with <br /> the fee schedule or method of calculation then in effect. <br /> 44.All of the conditions of approval shall be reproduced on the first page of the <br /> plans submitted for demolition, grading or building permits. Additional pages <br /> may be used if necessary. At least one (1) copy of the stamped approved <br /> plans, along with the Conditions of Approval, shall be available for review at <br /> the job site at all times. <br /> 45.Applicant shall submit a Traffic Control Plan to the City Engineer for review <br /> and approval prior to commencing any work on the Project, including <br /> demolition or grading work, for control procedures during the construction of <br /> the Project. The Plan shall include at least the following: the route(s) that <br /> construction trucks shall use to access the property, identification of the <br /> access point(s) to the site, any proposed staging area for trucks waiting to <br /> enter the site, traffic management for any work within the improved portion of <br /> a public right-of-way, and any proposed traffic controls, such as the use of <br /> flag persons, to ensure the safe entry and exit of trucks accessing the Project <br /> site. Throughout the construction period for the Project, the applicant must <br /> faithfully implement the approved Traffic Control Plan. <br /> 46.Applicant shall, prior to commencing any grading or building demolition, <br /> consult with County Environmental Health regarding vector control to reduce <br /> the displacement of mice and rats from the Project site to adjacent properties. <br /> The permittee shall carry out a program of vector reduction within 30 days of <br /> commencing construction activities. Additionally, the applicant shall distribute <br /> information to properties within 300 feet of the Project site boundaries with <br /> information about what to check to reduce the likelihood of vectors entering <br /> their property and buildings. <br /> ATTY/RES0.2785/FINGER RESO APPROVING VTM FINAL <br /> REV:08-31012 VR <br /> Page 17 of 20 <br />