My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 86 <br /> ATTACHMENT3 <br /> 47.Applicant shall, prior to the issuance of any demolition, building, or grading <br /> permit, submit a construction staging plan for the review and approval of the <br /> City Engineer and/or Chief Building Official or designee. The plan shall show <br /> where construction materials will be stockpiled prior to use, where <br /> construction debris will be collected, how frequently the debris will be <br /> removed, and where parking will be provided for construction equipment and <br /> construction workers. Construction activity on the Project site shall be in <br /> compliance with the approved construction staging plan <br /> 48.The access roadway shall be constructed and the fire hydrant(s) installed, <br /> functional and found satisfactory by the Fire Department before any <br /> combustible building materials are brought on site or before building <br /> inspection of the first building foundation, whichever occurs first. <br /> 49.The number and location of fire hydrants shall not be less than required by the <br /> Uniform Fire Code. These shall be shown on the improvement plans and <br /> constructed as part of the subdivision improvements. <br /> 50. Each of the houses in the development shall have an approved automatic fire <br /> sprinkler system installed, in accordance with Redwood City Ordinance 2326. <br /> 51.The private roadway shall be designed and maintained to support the imposed <br /> loads of fire apparatus (American Association of State Highway Transportation <br /> Officials, Standard H20) and it shall be designed with a finished surface that <br /> provides all-weather vehicle access in accordance with International Fire Code <br /> 503.2.3. <br /> 52.The private roadway shall be designated as a fire lane and shall be marked in <br /> accordance with the California Vehicle Code, Section 22500.1. On the private <br /> roadway entering from Finger Avenue, the development shall have a sign <br /> posted which clearly advises that there shall be no parking or stopping allowed <br /> along the roadway. <br /> 53.The water system serving the Project site shall provide the needed fire flow <br /> requirement of not less than 1,000 gallons per minute, with a minimum residual <br /> pressure of 20 pound per square inch for the duration of at least two hours, in <br /> accordance with the International Fire Code Appendix B. <br /> 54.The Project shall meet all other necessary Engineering, Fire and Building <br /> Department conditions of approval. <br /> 55.Applicant shall comply with all State and Federal regulations applicable to the <br /> P roj ect. <br /> ATTY/RES0.2785/FINGER RESO APPROVING VTM FINAL <br /> REV:08-31012 VR <br /> Page 18 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.