My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 96 <br /> WHEREAS, the Final E!R was published and made publicly availahle on June 8, <br /> 2012; and <br /> WHEREAS, on .�une 19, 2012, the Planning Commission held a duly naticed <br /> pubfic hearing on the Finger A�enue Project, including the Final EIR, and recommended <br /> that the City Council (1} certify the EIR, adopt the necessary CEQA Findings, and adopt <br /> a Mitigatian Monitoring and Reporting Plan in accordance with CEQA, by Resolution <br /> No. 12-16; and (2) strongly consider approval of the alternative identified in the Final <br /> EIR as t�e "Project with 25 Foot Creek Setback Alternative,° without (a) increasir�g <br /> home sizes elsewhere in Lots 1-�4, (b) reducing front yard setbacks or driveway aprons, <br /> ar (c) removing heritage trees other than those (10 trees) afready praposed for remo�al <br /> by the Project applicant, by Resofution No. 12-19; and <br /> WHER�AS, the "Project with 25 Foot Creek Setback Altemative" is similar to the <br /> Praject as proposed by the de�elop�r except that the residences on Lots 1-4 would be <br /> setback 25 feet from the top af creek bank and redUCed in size by 187 square feet for <br /> Lot 1, 348 square feef for �ot 2, 95 square feet for �.ot 3 and 87 square feet far Lot 4 (for <br /> a total building reduction of 724 square feet). With th� "Project with 25 Foot Creek <br /> Setback Alternati�e", th� Lot 3 residence, w}�ich previvusly r�quired an exception to <br /> allow 4n.9% (55 sq. ft.} lot coverage where 40°/fl fot coverage is the standard per Zoning <br /> Article 5, wouid also no ionger need an exception ta the City's lot coverage standard. <br /> The recommended Project Alternative would thus only require exceptions to lat size for <br /> sloping lots, buifding setbacks and to the City's pri�ate roadway engineering standard. <br /> WHEREAS, a notice of the City Council's public hearF�g on the Finger Avenue <br /> Project, including the Fir�al EfR, was mailed on June 27, 2Q12 and duly published in the <br /> Redwood City Daily News on June 29, 2012, and the City Council held a public hearing <br /> on th� Finger A�enue Project on July 9, 2012. <br /> NOW, TH�REFORE, BE IT RESOLVE� BY THE CITY COUNCIL O� THE CITY <br /> OF REDWOOD CITY AS FOLLQWS: <br /> 1. The above recitals are true and correct and together witi� the Staff Report <br /> and the application materials, incl�ding without limitation the �inaf EIR, �esting ter�tative <br /> `ma�, and all other dac�ments, repvrts, studies, memoranda, maps, oral and written <br /> testimony, and mater�a�s in th� City's file for #he applicatians and the Praject, and all <br /> adopted City planning doc�m�nts relating to the Project and the property including the <br /> City's Generaf Plan, Zoning Qrd�nance, and other applicable City laws and regulatians, <br /> and all associated appro�ed and certified environmental docum�nts, have together <br /> served as an adequate and ap�ropriate evidentiary basis for the findings and actions <br /> set forth in khis Resolutivn, <br /> ATTY/RES0.2262ICERTIFY�NG EIR FOR FINGER AVE <br /> REV:07-U2-12 VR <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.