My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 154 <br /> ATTACMMENT2 <br /> shall be paid at the time of issuance of building permits. The amount af the <br /> impact fees shall be determined at the time of paym�nt in accordance with <br /> the fee schedule ar method of calculation then in effect. <br /> �2.All of the condi#ions of appro�al shall be reproduced on the first page of the <br /> pfans submitted for demalition, grading ar building permits. Additional pages <br /> may be used if necessary. At least on� (1} copy af the stamped approved <br /> �lans, along with the Conditions of Approval, shall be available #or re�iaw at <br /> the job site at all times. <br /> 43.Applicant shall submit a Traffic Control Plan to the City Engineer far review <br /> and appra�al prior to commencing any work or� the project, including <br /> demalition or grading work, for cont�ol procedures d�ring the construction of <br /> the project. The Plan shall incfude at ieast the following: the raut�(s} that <br /> construction trucks shall use to access the property, identification of the <br /> access paint(s) to the site, aRy proposed staging area for trucks waiting to <br /> enter the site, traffc manag�ment for any work withir� the impraved portion of <br /> a public right-of-way, and any propased fraffic controls, such as the use of <br /> flag persans, to ensure #he safe entry and exit of trucks accessing the project <br /> site. Throughout the constructian period for the project, the appiicant must <br /> faithf�lly implement the approved Traffic Cantrol Plan. <br /> 44.Applicant shall, prior to comm�ncing any grading or buifding demolitian, <br /> consult with Co�nty Environmental Health and the Redwaod City Cammunity <br /> Development Department regarding vector controf to reduce the displacement <br /> af mice and rats from the praject site to adjacent praperties. The permittee <br /> shall carry out a program of vector reduction wi#hin 30 days of commencing <br /> constructior� activities. Additionally, the applicant shall distribute information to <br /> properties within 300 feet of the project sit� boundaries with information about <br /> what ta check to reduce the likelihood of vectors entering their property and <br /> buildings. <br /> 45.Applicant shall, priar to ihe issuance of any demolition, bui�ding, or grading <br /> permit, submit a canstruction staging plan for the review and appraval of the <br /> City Engir�eer and/or Chief Building Official or designee. The plan shall show <br /> where construction materials will be stockpiled prior to use, where <br /> construction debris wifl be collected, how frequently the debris will be <br /> removed, and where parkir�g will be pro�ided for construction equipment and <br /> construction workers. Construction activity on the project site shall be in <br /> compliance with the ap�raved construc�ion staging plan <br /> 46.The access roadway shall be constructed and the fire hydrant(s) installed, <br /> functional and found satisfactary by the Fire ❑epartment before any <br /> combustible building materiais are brought on site or before building <br /> inspection of the first building foundation, whichever occurs frst. <br /> ATTYIRE50.2263lAPPROVING A PLANN�n�EVEI.pPMENT PERMIT(FINGER AVE) <br /> REV:�7-02-12 VR <br /> Page 77 0(19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.