My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 158 <br /> ATTACHM�NT3 <br /> 187 square feet for Lot 1, 348 square feet for �ot 2, 95 square feet for Lot 3 and <br /> 87 square feet for Lot 4 (for a tatal building reductifln of 720 square feet). With <br /> the "Project with 25 Foot Creek 5etback Alternative", the Lot 3 resider�ce, which <br /> previausly required an exception ta allow 40.9°/a (55 sq. ft.) Int coverage where <br /> ��% lat caverage is the standard per Zoning �rdinance Article 5, Section 5.8, <br /> would also no longer need an exception to the City's lot cvverage standard. The <br /> recommended Project Alternative wauld thus only require �xceptions ta Iot size <br /> for sloping lots, building setbacks and to the City's private roadway engineering <br /> standar�; and <br /> WHEREAS, a notice of the City Council's public hearing on the Finger <br /> Avenue Project, including the F'inal EIR, was mailed on June 27, 2012 and �uly <br /> published in the Redwaod City Daily News on June 29, 2012, and the City <br /> Council f�eld a public hearing on the �ingEr Av�nue Project an July 9, 2012, in <br /> accordance with all a�plicable requirements of the State Planning and Zoning <br /> Law and the Redwood City Zoning Ordinance, to consider Planned Development <br /> Permit Application No. PD20Q8-06 and Vesting Tentati�e Map Application No. <br /> TM2008-08, and recei�ed and considered oral and documentary evidence on the <br /> applicatian; and <br /> WHEREAS, on July 9, 2012, the Ci#y Co�ncil certi�ed the Final Project <br /> EIR prepared by the City in accordance with the requirements of CEQA and, <br /> based on the EIR, adopted a Mitigation Manitoring and Reporting Pragram in <br /> compliance with all CEQA requirements; <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCfL OF <br /> THE CITY OF REDWOOD CITY AS �OL�OWS: <br /> Sectian 1. The City Council finds that the above recitals are <br /> accurate and constitut� findings in this matter and, together with the complete <br /> recard of proceedings for the Final EIR and the Praject, which includes withaut <br /> limitation all Staff Reports and appfication materials, including tha Final EIR, <br /> development plan, vestirtg tentati�e map, and all ather documents, reports, <br /> studies, memoranda, maps, oral and written testimony, and materials in the <br /> City's fle for the applica�ions and the Project, and ali adapted City planning <br /> documents relating to the Project and the property including the City's General <br /> Plan, Municipal Code, Zoning �rdinance, and ather applicable City laws and <br /> regulations, and all associated appro�ed and certified en�ironmental dacuments, <br /> ser�ed as an adequate and ap�rapriate e�identiary basis for the findings and <br /> actions set forth in this Resolution. <br /> ATTY/RES0.2264lAPPROVING A V�S7fNG TENTATlVE NlAP(FINGER AVE) <br /> R�V:07-02-12 VR <br /> Page 2 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.