My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Vanir Construction Management, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Vanir Construction Management, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 2:18:24 PM
Creation date
9/17/2012 2:18:22 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Vanir Construction Management, Inc.
PROJECT NAME
Redwood Creek Culvert Relocation Project and the Block 2 Development Project
RMP File Number
100
Date
9/17/2012
Reso Ref
15213
MO Ref
12-171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 3.15.2 Attend construction contractor's field quality assurance <br /> inspection(s) and review, for compliance with contract <br /> documents and coordinate special inspections required by the <br /> work of separate contractors/consultants. <br /> 3.15.3 Assure that construction contractor(s) coordinates and <br /> completes all required code compliance inspections, field tests <br /> and sign-offs required by REDWOOD CITY and any other <br /> regulatory or testing and inspection firms/agencies. <br /> 3.15.3 Review construction contractor's as-built documentation and <br /> confirm it is up-to-date to within one (1) week of construction <br /> and installation. <br /> 3.15.4 Coordinate construction activities and master Project schedule. <br /> 3.15.5 Maintain a complete set of files in the Project office containing a <br /> complete record of construction. The files shall contain all <br /> Project correspondence, meeting and telephone notes, <br /> inspection deficiency notices, inspection diaries, records of tests <br /> and test results, and inspection reports and notices, etc. <br /> 3.15.6 Use best efforts to make jobsite alcohol and drug free. <br /> 4.0 CLOSE-OUT <br /> PROJECT MANAGER shall provide all services necessary for the close-out of <br /> the construction contract consistent with the General Conditions of the Contracts for <br /> Construction for the Project, including, without limitation, the following: <br /> 4.1 Prepare schedule of all closeout activities, checkout items, and check-off <br /> list, noting construction contractor document requirements as set forth in <br /> Project documents. <br /> 4.2 Schedule, coordinate, and supervise final tests and start-up of all project <br /> components. For the purposes of this pa�agraph, coordinate means to <br /> inform all relevant parties with sufficient advance notice of the inspection <br /> or date of substantial completion, ensure site access and availability of <br /> resources or other PROJECT personnel who may be required for the <br /> work, and keep COMMUNITY DEVELOPMENT DIRECTOR advised of <br /> same. <br /> ATTY/AGR/2012.097/VANIR CONSTRUCTION MANAGEMENT AGREEMENT <br /> REV:08-07-12 VR <br /> Page 15 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.