My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:44:22 PM
Creation date
10/4/2012 4:59:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/8/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 2 <br /> Corporation Yard <br /> The Corporation Yard is approximately eight acres at the gateway to the City. From a <br /> development perspective there are numerous uses that are of a higher and better use, <br /> both economically and as a signature for entry into the City. Staff is regularly <br /> approached by the development community interested in acquiring this property. As <br /> important as determining the appropriate development and use for the site is finding a <br /> new and equally appropriate home for the City's Public Works needs. There are various <br /> ongoing discussions with other neighboring jurisdictions about finding a site for a shared <br /> Public Works Yard, in the interim staff has advised the various interested parties that <br /> they should do their due diligence and identify potential sites for at least Redwood City <br /> use. <br /> The Corporation Yard harkens back to another day when there was plentiful land on <br /> which to spread operations. Staff recognizes the constraints of finding eight <br /> unencumbered acres also located in an appropriate area of the City for such a use. The <br /> Corporation Yard likely fits best in an industrial zone of some sort, which is of limited <br /> supply in Redwood City. <br /> Staff recommends that the Council entertain offers of development only if the proposer <br /> demonstrates the ability to deliver a new Public Works Corporation Yard site and <br /> infrastructure, including necessary office and other support buildings and fueling <br /> systems. The site must be controllable by the proposer and deliverable to the City, <br /> which means any environmental review, is complete. <br /> Prior to proceeding with a Request for Proposals, staff will obtain preliminary title <br /> information so as to identify any potential restrictions or conditions on the land. Based <br /> on staff's analysis of other properties acquired and owned by the City, it is apparent that <br /> the City obtains property in myriad ways, many of which have restrictions that raise <br /> issues that must be resolved before clear title can be assured. <br /> Pine Street <br /> The Pine Street property is undevelopable right-of-way. The City acquired a street <br /> right-of-way interest in the Stambaugh Heller neighborhood. In 2011 the City paid <br /> nearly $80,000 to clean up the property, which had become a toxic dumping ground. <br /> The site is bounded by the railroad right of way owned by the Peninsula Corridor Joint <br /> Powers Board, a rail spur line owned by the Union Pacific Railroad, a small remnant <br /> triangle of land owned by San Mateo County, and property owned by W.L. Butler. A <br /> portion of the property was fenced after the City's clean up, a portion serves as street <br /> access to the Butler property, and a portion is fenced and actively used by the tenants <br /> of the Butler property. <br /> Because of the complexities of how the City's rights are held, in that it does not appear <br /> that the City holds the property in fee, but rather has public right-of-way rights over the <br /> land, and there are other property owners whose lands could also be included in a <br /> general clean up of the property boundaries, representatives of W.L. Butler have done <br /> considerable research to identify these issues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.