Laserfiche WebLink
EXHIBIT "B" <br />ON BROADWAY -PARKING GARAGE <br />CLARIFICATIONS & .EXCLUSIONS <br />3of8 <br />2470 SITE • All site furnishings including planters, benches, trash receptacles, ash <br /> FURNISHINGS urns, tree grates, decorative columns, bike racks, etc. is excluded. <br /> • City of Redwood City to remove and replace all parking meters with <br /> area of work and stora e. <br />2480 LANDSCAPE & • All landscape, planting, trees, planters and irrigation work including <br /> IRRIGATION sleeves is excluded. <br />2500 SITE CONCRETE All site concrete including curb, curb & gutter, walks, decorative <br /> concrete paving, planters, seat wall, pavers at Theater Way, <br /> Broadwa & Jefferson is excluded. <br />2580 STRIPING / • Striping, arrows, painted handicapped logos, and handicapped parking <br /> BUMPERS stall signs are included. <br /> • Precast vehicle wheel stops are excluded. <br /> • Diagonal striping is excluded. <br /> • Bond for stri in subcontractor is excluded. <br />2590 ART • Artwork is excluded. <br />2710 UNDERGROUND • Domestic Water: <br /> UTILITIES We have included 1 - 1" domestic water service with backflow <br /> device for garage. <br /> • Relocation of water in Theater Way is excluded. <br /> • Fire Water: <br /> ^ Provided 1 - 8" fire connection at Broadway <br /> • Provide 1 - 8" SDCV <br /> ^ Provide 1 - 8" x 4" FDC <br /> ^ Flush & hydro test <br /> • Storm Drain: Storm drain work for garage is excluded or not <br /> applicable. All connections to garage are through sanitary sewer. <br /> • Sanitary Sewer: <br /> ^ We have provided a 6"connection and clean out for the Garage. <br /> ^ Relocation of sanitary sewer in Theater Way is excluded. <br /> • Relocation of SBC phone duct, power, gas, cable TV, fiber optics, <br /> water, storm or sanitary sewer or new joint utility trench in City ROW <br /> re aired for com lesion of On Broadwa is excluded. <br />3100 STRUCTURAL 4" base rock below SOG is included assumed 1166 tons. <br /> CONCRETE • Assumed 3,000 PSI concrete for pile caps & grade beams. <br /> • Assumed 873 EA epoxy coated pile dowels. <br /> • Assumed 1,224 ton of reinforcing steel in garage structural concrete. <br /> • Assumed shear studs at column locations. <br /> • Assumed. no welding of rebar or shear studs at deck /column <br /> intersection; steel to be punched in shop to allow rebar to pass <br /> through. <br /> • Assumed stabilizer steel to be remain in podium deck. <br /> • Assumed 3,000 PSI concrete at 10" SOG and footings. <br /> <br /> • Assumed 4,000 PSI concrete at 10" elevated decks. <br /> • Assumed L shaped perimeter continuous footing in lieu of T footing <br /> to allow use of shotcrete or one-sided form directly to lagging. <br /> • We retain the option to use shotcrete or one-sided formed walls at <br /> perimeter shear walls. <br /> • Columns to be 3,000 PSI concrete encasing structural steel. <br /> • Finishes: <br /> • Garage: Swirl. <br /> ^ Walls: If shotcrete float finish, if CIP off form finish with tie and <br /> air ockets patched. <br />