Laserfiche WebLink
EXHIBIT "B" <br />ON BROADWAY -PARKING GARAGE <br />CLARIFICATIONS & EXCLUSIONS <br />4of8 <br /> • Underside of elevated decks: Off form finish, knock down Fins <br /> only, <br /> • Podium: Trowel. <br /> • "Rat" slab excluded. <br /> • Costs for winterization for concrete work is excluded. <br /> • Bond on concrete subcontractor is included. <br />3410 GFRC /PRECAST • Not used. <br /> CONCRETE <br />4200 MASONRY • Stair & elevator shaft walls, storage & machine room and Parking <br /> Management office walls assumed to be painted 8"x8"x 16" CMU. <br /> • Bond for masonr subcontractor is excluded. <br />5120 STRUCTURAL • Structural steel for parking garage consists of the following <br /> STEEL assumptions: <br /> ^ 76 gravity columns - 75 tons <br /> ^ 60 frame columns - 85 tons <br /> ^ 230 5" pipe stabilizers - 55 tons <br /> 36 brace transfer beams - 22 tons <br /> ^ Misc. connections @ exterior - 10 tons <br /> ^ Total tonnage: 247 tons <br /> • Assumed erection of steel from inside of excavation after installation <br /> of SOG. Assumed SOG will support approximately 160-ton rubber <br /> tire crane. <br /> • Assumed off loading of steel from Jefferson Ave. and intermittent <br /> lanes closures will be required. <br /> • Bond on structural steel subcontractor is included. <br />5300 METAL DECK Not used in ara e. <br />5500 MISC. METALS Assumed 40 EA bollards. <br /> • Assumed 30 LF trench drains & grates. <br /> • Assumed 240 LF ramp guardrails. <br /> • Assumed 6 flights of concrete filled metal pan stairs. <br /> • Assumed 6 total floors of elevator rails. <br /> • Assumed 2 EA elevator pit ]adders and sump pit frames and grates. <br /> • Cashier rails, barrier beams, HVAC platform supports, toilet partition <br /> supports, lavatory supports, elevator separator beams & screens are <br /> excluded. <br /> • Bond for miscellaneous metals subcontractor is excluded. <br />5800 EXPANSION • Expansion & seismic joints and covers are excluded. <br /> CONTROL <br />6100 ROUGH Assumed perimeter temporary 8' fence with mesh & viewing holes. <br /> CARPENTRY Site safety & miscellaneous carpentry as required. <br /> • Pedestrian walkways are excluded. <br />7100 WATERPROOFING Provided the following waterproofing: <br /> ^ Basement slab & elevator pits -Preprufe 300R. <br /> ^ Basement walls -Preprufe 160R &Hydroduct 220. Tieback <br /> penetrations to be detailed with standard WR Grace detail. <br /> ^ Below grade slab C Theater Way - Bituthene 4000 &Hydroduct <br /> 660 flood tested prior to cover. <br /> ^ Waterproofing warranties to be 10-year material & 5 year labor. <br /> • Bond on Ovate roofing subcontractor is included. <br />7210 INSULATION Not used. <br />7250 FIREPROOFING • Not used. <br />7510 ROOFING • Not used. <br />