Laserfiche WebLink
EA 10911-01 <br /> <br /> AGENDA NO. 5 <br /> <br /> NEGATIVE DECLARATION <br /> REDWOOD CITY, SAN MATEO COUNTY, CALIFORNIA <br /> <br />Project Description: <br /> <br />1. Developer. JMS Development Partners, 1601 Laurel Street, San Carlos, CA <br /> 94020 <br /> <br />2. Proposed Description and Location. <br /> 150 El Camino Real: APN 052-064-100, General Commercial - Combined <br /> Residential ('CG-R') ZOning District <br /> 20 Avondale Avenue: APN 052-064-110, Single Family Residential ('R-i') <br /> Zoning District <br /> <br />3. Proposed Action, Construct a new 19,237 square foot, three-story mixed-use <br /> building; including 13,466 square feet of office space on the first two stories, <br /> and 7 residential units on the third floor, with underground and surface <br /> parking. The site area consists of two parcels totaling approximately 19,55;0 <br /> square feet. The parcel at 150 El Camino Real was formerly used as a gas <br /> station site, the parcel at 20 Avondale Avenue was formerly used as single- <br /> family home site. The existing residential garage would be demolished. <br /> <br />Negative Declaration hlitigation hleasure$: <br /> <br />1. A Soils Report is required by the Engineering Division of Redwood City <br /> Community Development Services prior to issuance of a building permit. <br /> <br /> 2. The developer shall obtain a Grading Permit and a Dirt Hauling Permit <br /> from the Engineering and Construction Division of Redwood City Community <br /> Development Services prior to any grading or hauling of dirt. <br /> <br />3. The applicant shall submit a Soils Management Plan for review and <br /> approval by San Mateo County Environmental Health Services prior to <br /> issuance of the Grading Permit. <br /> <br /> -~. A DrainaDe Utility Plan =n~ = Storm Water PoJfutio~ Preve~ti~ Pia~ <br /> shall be prepared and submi~ed to the Engineering Division of Redwood Cib/ <br /> <br /> Page 1 of 4 <br /> <br /> <br />