Laserfiche WebLink
6.2.D. - Page 13 <br /> EXHIBIT "C" <br /> SCHEDULE OF HOME IMPROVEMENTS <br /> IVofe: The following renovafion projects have already been completed by fhe currenf owners <br /> during the 2090-2012 period: replacement of 153 seafs in fhe mezzanine 6alcony, upgrade of <br /> fhe electrical sysfem, fhe addifi�n of fire sprinklers, and fhe addifion of architecfural fighting. <br /> YEAR IMPROVEMENT <br /> 2013 Replace 32'f fixed seats on orchestra floor <br /> 2014 Repface lobby carpet <br /> 2015 Replace filoaring of orchestra pit <br /> 2017 Impro�� stainless steel display cases <br /> Have spire e�aluated by a structural engineer <br /> 2018 Restore and replace the spire as necessary based on the struc#urai engineer's <br /> eval�a#ion <br /> 2019 Paint side and back of buiiding <br /> 202Q Touch up facade paint as needed <br /> 2021 Update elecfirical power to marquee <br /> 2022 Replace 500 upper balcony seats <br /> ATTYIAGR12012.1841FOX THEATRE MILLS ACT CONTRACT <br /> REV: 11-15-12 VR <br /> Page 9 of 1 D <br />