Laserfiche WebLink
6.2.D. - Page 24 <br /> EXHIBIT "C" <br /> SCHEDULE �F' HOME IMPROVEMENTS <br /> Year One 2012 <br /> - Porch restoration (wood) baluster and ap�ropriate railing along step repair. <br /> {Completed as of 1I2012012} <br /> - Existing window repairs and restoration. (Completed as of 2/25/2012} <br /> - Remove all abandoned electrical, gas raceways and u�used exterior-mour�ted <br /> equipment. (Completed as af 2/2512012) <br /> - New painting (outside and original doors} (Completed as of 2125/2012) <br /> - Driveway treatment: partial concrete driveway {Campleted as 411 012 0 1 2) <br /> Year Two (2013� <br /> - Scraerting the new meter with a narrow vertical shrub <br /> - Landscaping <br /> Year Three to Five (2014-2016) <br /> - R�place existing fences, together with neighbors. {The left side would be fikely <br /> be done on 2Q12) <br /> - New roof and gu�ter for the front structure <br /> Year Six to Ten (2017-2022� <br /> - Prune palm tree. <br /> - prune all decie�uous trees (those that drop lea�es). <br /> ATTYIAGRI2612.18517261728 BREWSTER MILLS AC7 CONTRACT <br /> REV: 11-15-12 VR <br /> Page 9 of 10 <br />