Laserfiche WebLink
7.B. - Page 88 <br /> Redwood City Chapter 4.Environmental Impact Analysis <br /> analyzed in the 2007 FEIR.Middlefield Road would have an increase of 20 new trips and 50 diverted <br /> trips contributing to traffic noise levels.To evaluate the total contribution of the project plus the <br /> proposed modifications to the ambient noise environment,traffic noise levels for the project with <br /> the proposed modifications were modeled based on existing traffic volumes,which were compared <br /> to modeled noise levels for existing traffic volumes without the project.As shown in Table 4.5-2,the <br /> project with proposed modifications would result in an increase of less than 1 dBA along Middlefield <br /> Road and Woodside Road.Therefore,the traffic noise increase as a result of the proposed <br /> modifications is expected to result in a noise increase of less than 1 dBA on adjacent streets,and the <br /> increased noise levels would remain well within the City's noise standards. New traffic noise <br /> impacts would be less than significant. <br /> Table 4.5-2.Traffic Noise Modeling Results <br /> Difference <br /> between Existing <br /> with Project+ <br /> Distance Proposed <br /> Peak Hour from the Noise Level Modifications and <br /> Segment Traffic Centerline CNEL Existing without <br /> Roadway Location Volumel (feet) (dBA)z Project <br /> 2012 Existing with Project <br /> Middlefield—Weekday West of Willow 2245 50 67.1 - <br /> Middlefield—Weekend West of Willow 2335 50 67.2 - <br /> Woodside—Weekday South of 3855 50 72.3 - <br /> Middlefield <br /> Woodside—Weekend South of 3550 50 71.9 - <br /> Middlefield <br /> 2012 Existing with Project and Proposed Modifications <br /> Middlefield3— West of Willow 2315 50 67.2 0.7 <br /> Weekday <br /> Middlefield3— West of Willow 2405 50 67.4 0.7 <br /> Weekend <br /> Woodside4—Weekday South of 3875 50 72.3 0.1 <br /> Middlefield <br /> Woodside4—Weekend South of 3570 50 72.0 0.2 <br /> Middlefield <br /> 2012 Existing without Project <br /> Middlefields— West of Willow 1985 50 66.5 - <br /> Weekday <br /> Middlefields— West of Willow 2075 50 66.7 - <br /> Weekend <br /> Woodsideb—Weekday South of 3775 50 72.2 - <br /> Middlefield <br /> Woodsideb—Weekend South of 3470 50 71.8 - <br /> Middlefield <br /> Notes: <br /> �Peak hour volumes are derived from intersection counts at the Middlefield Road/Willow Street intersection and <br /> Middlefield Road/Woodside Road intersection(Appendix B-2,Figures 1 and 2). <br /> �Traffic noise level CNEL is calculated using the daily traffic volumes that are assumed to be 10 times of peak hour <br /> Addendum No.2 to the Environmental Impact Report for 4-43 September 2012 <br /> the Redwood City Costco Wholesale Project ICF 00154.12 <br />