My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chapter 5.Significant Irreversibl�7.B. - Page 123 <br /> Redwood City Changes <br /> • Implementation of the original project would change on-site drainage patterns;however,the <br /> amount of impervious surface did not change.Stormwater would continue to be collected and <br /> conveyed via the City's storm drain system.Stormwater pollutant control measures would <br /> reduce soil erosion and the potential for pollutants to enter runoff during construction and <br /> operation of the project.The proposed modifications would remove approximately 5,004 square <br /> feet of pervious space but stormwater treatment requirements of the existing NPDES Permit <br /> Condition C3 would control impacts on drainage and water quality to a less than significant <br /> level. <br /> • The demand for public services (for the original project and the proposed modifications)would <br /> be served by current facilities and staffing of public service agencies. Payment of development <br /> impact fees would allow school services to provide adequate services.Annual review of service <br /> levels for fire and police services would ensure acceptable service levels are maintained. <br /> • The project(and the proposed modifications)would not result in a change of land use on the <br /> site. Changes in the visual quality of the site would occur.These changes would be permanent,as <br /> long as the proposed structures are in use but are not considered significant and adverse. <br /> Based on the analyses in the 2007 FEIR and Section 4.0,Environmental Impact Analysis of this <br /> Addendum No. 2,potential environmental effects can be reduced to below levels of significance with <br /> the implementation of standard conditions and recommended mitigation measures.The conclusions <br /> described in Section 5 of the 2007 FEIR remain the same with implementation of the proposed <br /> modifications described in this Addendum No. 2. <br /> Addendum No.2 to the Environmental Impact Report for September 2012 <br /> the Redwood City Costco Wholesale Project 5-Z ICF 00154.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.