My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 163 <br /> City of Redwood City �in Haaenaum <br /> October 8, 2012 Page 2-30 <br /> 2.4.4 Buildinq Height Chanqes <br /> (a) Current Project. For the current Pete's Harbor proposal, the maximum building height would <br /> be 75 feet, which would be the rooftop of the parking garage (see Building 1 on Figure 2.5). <br /> The 5-story apartment building wrapping the parking garage would be a maximum 70 feet in <br /> height. In the immediate vicinity, the garage rooftop would not be visible due to its stepback <br /> from the wraparound apartments. The 3-story 10-plex buildings (see Buildings 2 through 11 on <br /> Figure 2.5, plus Figure 2.14) would be a maximum 40 feet, 6 inches in height. <br /> (b) Differences. The 2003 EIR project (both the Peninsula Marina and Pete's Harbor <br /> properties) included 13 residential towers ranging from 240 feet (five buildings) to 260 feet (eight <br /> buildings) in height, 12 mid-rise residential and two office buildings of 74 to 84 feet in height, <br /> and 99 townhouses and several retail buildings 24 feet in height. The Pete's Harbor portion of <br /> the 2003 EIR project included five residential towers up to 240 feet in height and numerous low- <br /> rise residential flats and townhouses. <br /> In sum, compared to the 2003 EIR project, the current Pete's Harbor project would reduce the <br /> maximum height of the tallest buildings from 240 feet to 75 feet, and reduce the number of the <br /> tallest buildings from five to one. <br /> 2.4.5 Construction Period Differences <br /> (a) Current Proiect. According to the applicant, the current Pete's Harbor project would require <br /> approximately 30 months of construction, anticipated to begin in the first quarter of 2013. Initial <br /> occupancy would begin in fall 2014 (i.e., in the wraparound building). <br /> (b) Differences. The 2003 EIR project was anticipated to require approximately ten years of <br /> construction, depending on market conditions. <br /> 2.5 REQUIRED JURISDICTIONAL APPROVALS <br /> 2.5.1 Citv Approvals <br /> The following interrelated City approvals are expected to be necessary to implement the <br /> currently proposed Pete's Harbor project: <br /> (1) Planned Development (PD) Permit approval, including a request for a parking modification, <br /> (2) Tentative Map approval, <br /> (3) lot line adjustment, <br /> (4) design review, and approval of an Architectural Permit, <br /> (5) improvement plan approval, <br /> (6) grading permit approval, <br /> T.•1106951Addenduml2(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.